X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495142413000

Well Details

Well ID: 0495142413000
Loading map...
Location: 00/13-24-049-14W5/0
Location Alias: 00/13-24-49-14 W5M
Location Alias 2: 00/13-24-049-14 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 14
Section: 24
County/Municipality: Yellowhead County
Well Name: RIDGEBACK WESTPEM 13-24-49-14
Operator Name: Ridgeback Resources Inc.
License Number: 0433985
License Date: 2011-06-03
License Status: Issued
Spud Date: 2011-07-21
Final Drill Date: 2011-08-02
Well Total Depth: 3708.00 m
Surface Hole Latitude: 53.247463
Surface Hole Longitude: -115.898976

For data sources see[1][2]

Well History

Date Event
2011-06-03 Obtained License
2011-07-21 Lost Circulation Occurred
2011-07-22 Surface Casing Operation Performed
2011-07-25 Direction Drilling Operation Performed - Horizontal
2011-07-28 Well Log Performed
2011-08-02 Finished Drilling
2011-08-02 Well Log Performed
2011-08-02 Well Mode changed to Drilled and Cased
2011-08-03 Well Log Performed
2011-08-04 Perforation Treatment Performed - Open-Hole Completion
2011-08-04 Production Casing Operation Performed
2011-08-04 Rig Released
2011-08-15 Well Log Performed
2011-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-24 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-26 Well Began Production
2011-08-26 Well Fluid changed to Crude Oil
2011-08-26 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-25 1680.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-04 Open Hole/Barefoot Completion 3703.00 3708.00 0
2011-08-23 Multi-Stage Fracture 3089.10 3089.20 0
2011-08-24 Multi-Stage Fracture 3013.70 3013.80 0
2011-08-24 Multi-Stage Fracture 2937.20 2937.30 0
2011-08-25 Multi-Stage Fracture 2860.20 2860.30 0
2011-08-25 Multi-Stage Fracture 2784.20 2784.30 0
2011-08-25 Multi-Stage Fracture 2706.90 2707.00 0
2011-08-25 Multi-Stage Fracture 2631.40 2631.50 0
2011-08-25 Multi-Stage Fracture 2555.80 2555.90 0
2011-08-25 Multi-Stage Fracture 2481.00 2481.10 0
2011-08-25 Multi-Stage Fracture 2405.70 2405.80 0
2011-08-23 Multi-Stage Fracture 3691.40 3691.50 0
2011-08-25 Multi-Stage Fracture 2331.00 2331.10 0
2011-08-25 Multi-Stage Fracture 2268.80 2268.90 0
2011-08-23 Multi-Stage Fracture 3621.70 3621.80 0
2011-08-23 Multi-Stage Fracture 3545.50 3545.60 0
2011-08-23 Multi-Stage Fracture 3469.40 3469.50 0
2011-08-23 Multi-Stage Fracture 3393.40 3393.50 0
2011-08-23 Multi-Stage Fracture 3316.60 3316.70 0
2011-08-23 Multi-Stage Fracture 3241.90 3242.00 0
2011-08-23 Multi-Stage Fracture 3165.50 3165.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2493 0.0 0.0 0.0
2012 8162 0.0 0.0 0.0
2013 8165 0.0 0.0 0.0
2014 8674 0.0 0.0 0.0
2015 7994 0.0 0.0 0.0
2016 8499 0.0 0.0 0.0
2017 8223 0.0 0.0 0.0
2018 8526 0.0 0.0 0.0
2019 8496 0.0 0.0 0.0
2020 2057 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-07-21 Lost Circulation 200.00 417.00

For data sources see[7]

References