X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495120701000

Well Details

Well ID: 0495120701000
Loading map...
Location: 00/01-07-049-12W5/0
Location Alias: 00/01-07-49-12 W5M
Location Alias 2: 00/01-07-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 07
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 1-7-49-12
Operator Name: Ridgeback Resources Inc.
License Number: 0423890
License Date: 2010-09-24
License Status: Amended
Spud Date: 2010-10-18
Final Drill Date: 2010-10-29
Well Total Depth: 3432.00 m
Surface Hole Latitude: 53.208847
Surface Hole Longitude: -115.758490

For data sources see[1][2]

Well History

Date Event
2010-09-24 Obtained License
2010-10-20 Surface Casing Operation Performed
2010-10-23 Direction Drilling Operation Performed - Horizontal
2010-10-23 Well Log Performed
2010-10-29 Finished Drilling
2010-10-29 Perforation Treatment Performed - Open-Hole Completion
2010-10-29 Well Log Performed
2010-10-29 Well Mode changed to Drilled and Cased
2010-10-31 Liner Casing Operation Performed
2010-10-31 Production Casing Operation Performed
2010-10-31 Rig Released
2010-11-26 Well Log Performed
2010-12-10 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-11 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-17 Well Began Production
2010-12-17 Well Fluid changed to Crude Oil
2010-12-17 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-23 1647.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-29 Open Hole/Barefoot Completion 3427.00 3432.00 0
2010-12-11 Multi-Stage Fracture 2871.40 2871.50 0
2010-12-11 Multi-Stage Fracture 2808.50 2808.60 0
2010-12-11 Multi-Stage Fracture 2745.70 2745.80 0
2010-12-11 Multi-Stage Fracture 2682.40 2682.50 0
2010-12-11 Multi-Stage Fracture 2619.60 2619.70 0
2010-12-11 Multi-Stage Fracture 2568.00 2568.10 0
2010-12-11 Multi-Stage Fracture 2504.70 2504.80 0
2010-12-11 Multi-Stage Fracture 2441.70 2441.80 0
2010-12-11 Multi-Stage Fracture 2378.80 2378.90 0
2010-12-11 Multi-Stage Fracture 2315.70 2315.80 0
2010-12-10 Multi-Stage Fracture 3392.30 3392.40 0
2010-12-11 Multi-Stage Fracture 2250.70 2250.80 0
2010-12-11 Multi-Stage Fracture 2169.50 2169.60 0
2010-12-10 Multi-Stage Fracture 3311.10 3311.20 0
2010-12-10 Multi-Stage Fracture 3248.30 3248.40 0
2010-12-10 Multi-Stage Fracture 3185.40 3185.50 0
2010-12-10 Multi-Stage Fracture 3122.50 3122.60 0
2010-12-10 Multi-Stage Fracture 3060.00 3060.10 0
2010-12-10 Multi-Stage Fracture 2997.40 2997.50 0
2010-12-11 Multi-Stage Fracture 2934.20 2934.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 137 0.0 0.0 0.0
2011 7764 0.0 0.0 0.0
2012 8182 0.0 0.0 0.0
2013 8169 0.0 0.0 0.0
2014 7745 0.0 0.0 0.0
2015 7862 0.0 0.0 0.0
2016 8736 0.0 0.0 0.0
2017 8329 0.0 0.0 0.0
2018 8678 0.0 0.0 0.0
2019 8441 0.0 0.0 0.0
2020 2108 0.0 0.0 0.0

For data sources see[6]

References