If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495120303000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.208448,"lon":-115.677662,"icon":""}]} |
| Location: 00/03-03-049-12W5/0 | |
| Location Alias: 00/03-03-49-12 W5M | |
| Location Alias 2: 00/03-03-049-12 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 03 | |
| County/Municipality: Yellowhead County | |
| Well Name: RIDGEBACK PEMBINA 3-3-49-12 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0469913 | |
| License Date: 2014-09-15 | |
| License Status: Issued | |
| Spud Date: 2014-12-08 | |
| Final Drill Date: 2014-12-17 | |
| Well Total Depth: 3501.00 m | |
| Surface Hole Latitude: 53.208448 | |
| Surface Hole Longitude: -115.677662 |
| Date | Event |
|---|---|
| 2014-09-15 | Obtained License |
| 2014-12-09 | Surface Casing Operation Performed |
| 2014-12-11 | Direction Drilling Operation Performed - Deviate |
| 2014-12-12 | Direction Drilling Operation Performed - Horizontal |
| 2014-12-17 | Finished Drilling |
| 2014-12-17 | Well Log Performed |
| 2014-12-17 | Well Mode changed to Drilled and Cased |
| 2014-12-18 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-12-18 | Production Casing Operation Performed |
| 2014-12-18 | Rig Released |
| 2015-01-09 | Well Log Performed |
| 2015-01-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-01-20 | Well Began Production |
| 2015-01-20 | Well Fluid changed to Crude Oil |
| 2015-01-20 | Well Mode changed to Flowing |
| 2015-01-22 | Well Log Performed |
| 2015-02-20 | Well Fluid changed to Crude Oil |
| 2015-02-20 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-12-08 | Ensign Drilling Inc. | 360 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-12-11 | 1509.40 | Deviate (5 - 79 degrees) |
| 2014-12-12 | 2078.10 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-12-18 | Open Hole/Barefoot Completion | 3497.00 | 3501.00 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 2881.20 | 2881.30 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 2807.20 | 2807.30 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 2732.00 | 2732.10 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 2672.00 | 2672.10 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 2596.70 | 2596.80 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 2521.90 | 2522.00 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 2433.30 | 2433.40 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 2359.00 | 2359.10 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 2326.70 | 2326.80 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 2250.90 | 2251.00 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 3471.60 | 3471.70 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 2160.90 | 2161.00 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 3418.50 | 3418.60 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 3331.00 | 3331.10 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 3271.10 | 3271.20 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 3196.50 | 3196.60 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 3104.00 | 3104.10 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 3029.60 | 3029.70 | 0 |
| 2015-01-18 | Multi-Stage Fracture | 2928.30 | 2928.40 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-01-18 | 2015-01-18 | 1,911 | 3,415 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 84.7298 | N/A | |||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.9003 | N/A | ||
| 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 6.8109 | N/A | ||
| DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0128 | N/A | |
| Water | 7732-18-5 | 100 | 0.0134 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1852 | N/A | |
| DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0911 | N/A | |
| Ethoxylated phenolic resin | 8300 | 100 | 0.0926 | N/A | ||||
| Isobutyl ketone | 8300 | 100 | 0.0913 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.1079 | N/A | ||||
| Organic acid salts 1 | 8300 | 100 | 0.0911 | N/A | ||||
| Organic acid salts 2 | 8300 | 100 | 0.093 | N/A | ||||
| Organic acid salts 3 | 8300 | 100 | 0.0926 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 5.7147 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0748 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-01-15 | 2015-01-15 | Recycled Fracturing Water (treated at well site) | 1453 |
| 2015-01-15 | 2015-01-15 | Recycled Fracturing Water (treated at well site) | 85 |
| 2015-01-17 | 2015-01-18 | Surface Water - Lake | 1888 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 7532 | 0.0 | 0.0 | 0.0 |
| 2016 | 8755 | 0.0 | 0.0 | 0.0 |
| 2017 | 8727 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8738 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-12-18 | No Incident Encountered | 0.00 | 0.00 |
| 2015-01-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]