If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495120301002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.208857,"lon":-115.664741,"icon":""}]} |
Location: 00/01-03-049-12W5/2 | |
Location Alias: 00/01-03-49-12 W5M | |
Location Alias 2: 00/01-03-049-12 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 03 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 16-3-49-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0450102 | |
License Date: 2012-11-15 | |
License Status: Amended | |
Spud Date: 2012-12-03 | |
Final Drill Date: 2012-12-17 | |
Well Total Depth: 3513.00 m | |
Surface Hole Latitude: 53.208857 | |
Surface Hole Longitude: -115.664741 |
Date | Event |
---|---|
2012-11-15 | Obtained License |
2012-12-04 | Surface Casing Operation Performed |
2012-12-07 | Direction Drilling Operation Performed - Deviate |
2012-12-08 | Direction Drilling Operation Performed - Horizontal |
2012-12-08 | Well Log Performed |
2012-12-10 | Direction Drilling Operation Performed - Horizontal |
2012-12-10 | Direction Drilling Operation Performed - Sidetrack Fish |
2012-12-10 | Well Log Performed |
2012-12-17 | Finished Drilling |
2012-12-17 | Well Log Performed |
2012-12-17 | Well Mode changed to Drilled and Cased |
2012-12-19 | Production Casing Operation Performed |
2012-12-20 | Perforation Treatment Performed - Open-Hole Completion |
2012-12-20 | Rig Released |
2013-01-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-02-03 | Well Began Production |
2013-02-03 | Well Fluid changed to Crude Oil |
2013-02-03 | Well Mode changed to Flowing |
2013-04-16 | Well Fluid changed to Crude Oil |
2013-04-16 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2012-12-07 | 1628.00 | Deviate (5 - 79 degrees) |
2012-12-08 | 1983.00 | Horizontal |
2012-12-10 | 2020.00 | Sidetrack fish |
2012-12-10 | 2020.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-12-20 | Open Hole/Barefoot Completion | 3509.00 | 3513.00 | 0 |
2013-01-30 | Multi-Stage Fracture | 2900.30 | 2900.40 | 0 |
2013-01-30 | Multi-Stage Fracture | 2826.70 | 2826.80 | 0 |
2013-01-30 | Multi-Stage Fracture | 2766.20 | 2766.30 | 0 |
2013-01-30 | Multi-Stage Fracture | 2695.20 | 2695.30 | 0 |
2013-01-30 | Multi-Stage Fracture | 2624.70 | 2624.80 | 0 |
2013-01-30 | Multi-Stage Fracture | 2566.90 | 2567.00 | 0 |
2013-01-30 | Multi-Stage Fracture | 2494.60 | 2494.70 | 0 |
2013-01-30 | Multi-Stage Fracture | 2432.10 | 2432.20 | 0 |
2013-01-30 | Multi-Stage Fracture | 2355.20 | 2355.30 | 0 |
2013-01-30 | Multi-Stage Fracture | 2292.80 | 2292.90 | 0 |
2013-01-29 | Multi-Stage Fracture | 3484.40 | 3484.50 | 0 |
2013-01-30 | Multi-Stage Fracture | 2230.40 | 2230.50 | 0 |
2013-01-30 | Multi-Stage Fracture | 2153.60 | 2153.70 | 0 |
2013-01-29 | Multi-Stage Fracture | 3401.20 | 3401.30 | 0 |
2013-01-29 | Multi-Stage Fracture | 3327.20 | 3327.30 | 0 |
2013-01-29 | Multi-Stage Fracture | 3238.00 | 3238.10 | 0 |
2013-01-29 | Multi-Stage Fracture | 3161.80 | 3161.90 | 0 |
2013-01-29 | Multi-Stage Fracture | 3100.40 | 3100.50 | 0 |
2013-01-29 | Multi-Stage Fracture | 3038.40 | 3038.50 | 0 |
2013-01-29 | Multi-Stage Fracture | 2962.10 | 2962.20 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-01-29 | 2013-01-30 | 1,905 | 2,603 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 79.5351 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 8.5185 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 5.0819 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 1.7697 | N/A | ||
Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0146 | N/A | |
Water | 7732-18-5 | 100 | 0.0153 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.191 | N/A | |
DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0888 | N/A | |
Ethoxylated phenolic resin | 8300 | 100 | 0.0915 | N/A | ||||
Isobutyl ketone | 8300 | 100 | 0.089 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.1104 | N/A | ||||
Organic acid salts 1 | 8300 | 100 | 0.0888 | N/A | ||||
Organic acid salts 2 | 8300 | 100 | 0.0902 | N/A | ||||
Organic acid salts 3 | 8300 | 100 | 0.0915 | N/A | ||||
Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 6.9483 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0656 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-01-29 | 2013-01-30 | Surface Water - River | 2700 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 6619 | 0.0 | 0.0 | 0.0 |
2014 | 8695 | 0.0 | 0.0 | 0.0 |
2015 | 8496 | 0.0 | 0.0 | 0.0 |
2016 | 8724 | 0.0 | 0.0 | 0.0 |
2017 | 8678 | 0.0 | 0.0 | 0.0 |
2018 | 8743 | 0.0 | 0.0 | 0.0 |
2019 | 8609 | 0.0 | 0.0 | 0.0 |
2020 | 2154 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-12-20 | No Incident Encountered | 0.00 | 0.00 |
2013-02-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]