If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495120101000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.209565,"lon":-115.616871,"icon":""}]} |
Location: 00/01-01-049-12W5/0 | |
Location Alias: 00/01-01-49-12 W5M | |
Location Alias 2: 00/01-01-049-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 01 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 1-1-49-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0436368 | |
License Date: 2011-08-26 | |
License Status: Issued | |
Spud Date: 2011-09-19 | |
Final Drill Date: 2011-09-29 | |
Well Total Depth: 3527.00 m | |
Surface Hole Latitude: 53.209565 | |
Surface Hole Longitude: -115.616871 |
Date | Event |
---|---|
2011-08-26 | Obtained License |
2011-09-20 | Surface Casing Operation Performed |
2011-09-21 | Well Log Performed |
2011-09-22 | Direction Drilling Operation Performed - Horizontal |
2011-09-29 | Finished Drilling |
2011-09-29 | Well Log Performed |
2011-09-29 | Well Mode changed to Drilled and Cased |
2011-10-01 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-01 | Production Casing Operation Performed |
2011-10-01 | Rig Released |
2011-11-01 | Well Log Performed |
2011-11-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-18 | Well Began Production |
2011-11-18 | Well Fluid changed to Crude Oil |
2011-11-18 | Well Mode changed to Flowing |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-22 | 1398.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-01 | Open Hole/Barefoot Completion | 3519.00 | 3527.00 | 0 |
2011-11-16 | Multi-Stage Fracture | 2950.40 | 2950.50 | 0 |
2011-11-17 | Multi-Stage Fracture | 2873.40 | 2873.50 | 0 |
2011-11-17 | Multi-Stage Fracture | 2810.90 | 2811.00 | 0 |
2011-11-17 | Multi-Stage Fracture | 2737.80 | 2737.90 | 0 |
2011-11-17 | Multi-Stage Fracture | 2676.60 | 2676.70 | 0 |
2011-11-17 | Multi-Stage Fracture | 2600.00 | 2600.10 | 0 |
2011-11-17 | Multi-Stage Fracture | 2537.50 | 2537.60 | 0 |
2011-11-17 | Multi-Stage Fracture | 2460.40 | 2460.50 | 0 |
2011-11-17 | Multi-Stage Fracture | 2398.00 | 2398.10 | 0 |
2011-11-17 | Multi-Stage Fracture | 2335.60 | 2335.70 | 0 |
2011-11-16 | Multi-Stage Fracture | 3493.50 | 3493.60 | 0 |
2011-11-17 | Multi-Stage Fracture | 2259.90 | 2260.00 | 0 |
2011-11-17 | Multi-Stage Fracture | 2197.30 | 2197.40 | 0 |
2011-11-16 | Multi-Stage Fracture | 3425.00 | 3425.10 | 0 |
2011-11-16 | Multi-Stage Fracture | 3361.90 | 3362.00 | 0 |
2011-11-16 | Multi-Stage Fracture | 3285.10 | 3285.20 | 0 |
2011-11-16 | Multi-Stage Fracture | 3222.40 | 3222.50 | 0 |
2011-11-16 | Multi-Stage Fracture | 3146.80 | 3146.90 | 0 |
2011-11-16 | Multi-Stage Fracture | 3088.80 | 3088.90 | 0 |
2011-11-16 | Multi-Stage Fracture | 3013.00 | 3013.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 288 | 0.0 | 0.0 | 0.0 |
2012 | 8175 | 0.0 | 0.0 | 0.0 |
2013 | 8592 | 0.0 | 0.0 | 0.0 |
2014 | 8584 | 0.0 | 0.0 | 0.0 |
2015 | 7299 | 0.0 | 0.0 | 0.0 |
2016 | 8595 | 0.0 | 0.0 | 0.0 |
2017 | 8679 | 0.0 | 0.0 | 0.0 |
2018 | 8387 | 0.0 | 0.0 | 0.0 |
2019 | 8739 | 0.0 | 0.0 | 0.0 |
2020 | 2153 | 0.0 | 0.0 | 0.0 |
For data sources see[6]