X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495103007000

Well Details

Well ID: 0495103007000
Loading map...
Location: 00/07-30-049-10W5/0
Location Alias: 00/07-30-49-10 W5M
Location Alias 2: 00/07-30-049-10 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 10
Section: 30
County/Municipality: Brazeau County
Well Name: KEYERA PEMBINA 7-30-49-10
Operator Name: Keyera Energy Ltd.
License Number: 0070278
License Date: 1978-06-21
License Status: Amended
Spud Date: 1978-06-06
Final Drill Date: 1978-08-21
Well Total Depth: 2920.00 m
Surface Hole Latitude: 53.255227
Surface Hole Longitude: -115.447552

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-06-21 Obtained License
1978-07-22 Kick Occurred
1978-08-08 Drill Stem Test Performed
1978-08-21 Finished Drilling
1978-08-21 Well Mode changed to Drilled and Cased
1978-08-22 Well Log Performed
1978-08-23 Liner Casing Operation Performed
1978-08-29 Well Log Performed
1978-09-02 Perforation Treatment Performed - Jet Perforation
1978-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-06 Well Began Production
1978-09-06 Well Fluid changed to Crude Oil
1978-09-06 Well Mode changed to Flowing
1979-11-30 Well Fluid changed to Crude Oil
1979-11-30 Well Mode changed to Suspended
1980-11-01 Well Fluid changed to Crude Oil
1980-11-01 Well Mode changed to Flowing
1981-04-30 Well Fluid changed to Crude Oil
1981-04-30 Well Mode changed to Suspended
1981-12-01 Well Fluid changed to Crude Oil
1981-12-01 Well Mode changed to Flowing
1984-01-12 Well Log Performed
1984-01-21 Perforation Treatment Performed - Cement Squeeze
1984-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-20 Perforation Treatment Performed - Jet Perforation
1984-02-20 Well Log Performed
1984-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-01 Well Fluid changed to Crude Oil
1984-08-01 Well Mode changed to Suspended
1984-10-01 Well Fluid changed to Crude Oil
1984-10-01 Well Mode changed to Pumping
1984-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-31 Well Fluid changed to Crude Oil
1984-12-31 Well Mode changed to Suspended
1985-01-30 Perforation Treatment Performed - Fractured
1985-01-30 Perforation Treatment Performed - Jet Perforation
1985-02-01 Well Fluid changed to Crude Oil
1985-02-01 Well Mode changed to Pumping
1985-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-13 Perforation Treatment Performed - Jet Perforation
1991-09-13 Well Log Performed
1991-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-05 Well Log Performed
1996-11-25 Well Log Performed
1996-12-01 Perforation Treatment Performed - Cement Squeeze
1996-12-01 Well Log Performed
2005-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-10 Plug Back Performed
2005-01-10 Well Fluid changed to Crude Oil
2005-01-10 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-09-02 Perforation 2783.50 2786.50 10
1984-02-20 Perforation 2764.00 2765.00 7
1984-02-20 Perforation 2769.00 2772.00 7
1984-02-21 Acid Treatment 2755.00 2774.80 0
1984-10-09 Acid Treatment 2755.00 2774.00 0
1985-01-30 Perforation 2755.00 2757.00 7
1985-01-30 Perforation 2759.00 2760.00 7
1985-01-30 Perforation 2765.00 2769.00 7
1985-01-30 Perforation 2772.00 2774.70 7
1985-01-30 Fracture 2755.00 2774.70 0
1985-07-29 Acid Treatment 2755.00 2774.80 0
1978-09-02 Perforation 2773.80 2774.80 10
1991-09-13 Perforation 2755.00 2768.00 13
1991-09-16 Acid Treatment 2755.00 2768.00 0
1996-12-01 Cement Squeeze 2773.80 2774.80 0
2005-01-10 Packing Device Capped w/Cement 2740.00 2740.40 0
1978-09-02 Perforation 2777.00 2778.50 10
1978-09-02 Perforation 2755.00 2757.00 10
1978-09-02 Perforation 2759.00 2760.00 10
1978-09-05 Acid Treatment 2755.00 2786.50 0
1984-01-21 Cement Squeeze 2777.00 2786.50 0
1984-01-22 Acid Treatment 2755.00 2774.80 0
1984-01-25 Acid Treatment 2755.00 2774.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 2021 0.0 0.0 0.0
1979 6811 0.0 0.0 0.0
1980 878 0.0 0.0 0.0
1981 2338 0.0 0.0 0.0
1982 5664 0.0 0.0 0.0
1983 5808 0.0 0.0 0.0
1984 5939 0.0 0.0 0.0
1985 5634 0.0 0.0 0.0
1986 3469 0.0 0.0 0.0
1987 6990 0.0 0.0 0.0
1988 7168 0.0 0.0 0.0
1989 7882 0.0 0.0 0.0
1990 7528 0.0 0.0 0.0
1991 7197 0.0 0.0 0.0
1992 7629 0.0 0.0 0.0
1993 8249 0.0 0.0 0.0
1994 8267 0.0 0.0 0.0
1995 8360 0.0 0.0 0.0
1996 5607 0.0 0.0 0.0
1997 8251 0.0 0.0 0.0
1998 8584 0.0 0.0 0.0
1999 6955 0.0 0.0 0.0
2000 8560 0.0 0.0 0.0
2001 8694 0.0 0.0 0.0
2002 8482 0.0 0.0 0.0
2003 8209 0.0 0.0 0.0
2004 8007 0.0 0.0 0.0
2005 100 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-07-22 Kick 2129.80 2129.80

For data sources see[6]

References