If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495090103F10 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.201814,"lon":-115.181934,"icon":""}]} |
| Location: F1/03-01-049-09W5/0 | |
| Location Alias: F1/03-01-49-09 W5M | |
| Location Alias 2: F1/03-01-049-09 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 09 | |
| Section: 01 | |
| County/Municipality: Brazeau County | |
| Well Name: BAYTEX PEMBINA 3-1-49-9 | |
| Operator Name: Baytex Energy Ltd. | |
| License Number: 0349519 | |
| License Date: 2006-01-19 | |
| License Status: Suspension | |
| Spud Date: 2006-03-14 | |
| Final Drill Date: 2006-04-08 | |
| Well Total Depth: 2745.00 m | |
| Surface Hole Latitude: 53.201814 | |
| Surface Hole Longitude: -115.181934 |
| Date | Event |
|---|---|
| 2006-01-19 | Obtained License |
| 2006-02-08 | Surface Casing Operation Performed |
| 2006-03-16 | Direction Drilling Operation Performed - Deviate |
| 2006-04-08 | Finished Drilling |
| 2006-04-08 | Well Mode changed to Drilled and Cased |
| 2006-04-10 | Production Casing Operation Performed |
| 2006-04-11 | Rig Released |
| 2006-04-21 | Well Log Performed |
| 2006-04-30 | Perforation Treatment Performed - Jet Perforation |
| 2006-04-30 | Well Log Performed |
| 2006-05-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2006-06-17 | Well Log Performed |
| 2006-08-20 | Well Began Production |
| 2006-08-20 | Well Fluid changed to Water |
| 2006-08-20 | Well Type changed to Source |
| 2007-03-11 | Well Log Performed |
| 2007-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2008-02-07 | Perforation Treatment Performed - Jet Perforation |
| 2008-02-09 | Perforation Treatment Performed - Remedial Casing |
| 2008-02-10 | Perforation Treatment Performed - Remedial Casing |
| 2008-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2011-11-30 | Well Fluid changed to Water |
| 2011-11-30 | Well Mode changed to Suspended |
| 2011-11-30 | Well Type changed to Source |
| 2011-12-01 | Well Log Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2006-03-16 | 475.90 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-04-30 | Perforation | 2683.50 | 2691.00 | 17 |
| 2006-05-02 | Acid Treatment | 2580.50 | 2586.50 | 0 |
| 2007-03-13 | Acid Treatment | 2683.50 | 2691.00 | 0 |
| 2007-03-13 | Acid Treatment | 2669.00 | 2672.50 | 0 |
| 2007-03-13 | Acid Treatment | 2633.00 | 2643.00 | 0 |
| 2007-03-13 | Acid Treatment | 2610.00 | 2612.00 | 0 |
| 2007-03-13 | Acid Treatment | 2580.50 | 2586.50 | 0 |
| 2008-02-07 | Perforation | 470.00 | 471.00 | 17 |
| 2008-02-07 | Perforation | 408.00 | 409.10 | 17 |
| 2008-02-09 | Remedial Casing Cementing | 470.00 | 471.00 | 0 |
| 2008-02-10 | Remedial Casing Cementing | 408.00 | 409.10 | 0 |
| 2006-04-30 | Perforation | 2669.00 | 2672.50 | 17 |
| 2008-02-20 | Acid Treatment | 2580.50 | 2691.00 | 0 |
| 2006-04-30 | Perforation | 2633.00 | 2643.00 | 17 |
| 2006-04-30 | Perforation | 2610.00 | 2612.00 | 17 |
| 2006-04-30 | Perforation | 2580.50 | 2586.50 | 17 |
| 2006-05-02 | Acid Treatment | 2683.50 | 2691.00 | 0 |
| 2006-05-02 | Acid Treatment | 2669.00 | 2672.50 | 0 |
| 2006-05-02 | Acid Treatment | 2633.00 | 2643.00 | 0 |
| 2006-05-02 | Acid Treatment | 2610.00 | 2612.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 2240 | 0.0 | 0.0 | 0.0 |
| 2007 | 4545 | 0.0 | 0.0 | 0.0 |
| 2008 | 6896 | 0.0 | 0.0 | 0.0 |
| 2009 | 8651 | 0.0 | 0.0 | 0.0 |
| 2010 | 3974 | 0.0 | 0.0 | 0.0 |
For data sources see[6]