X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495083408000

Well Details

Well ID: 0495083408000
Loading map...
Location: 00/08-34-049-08W5/0
Location Alias: 00/08-34-49-08 W5M
Location Alias 2: 00/08-34-049-08 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 08
Section: 34
County/Municipality: Brazeau County
Well Name: ARC PEMBINA 8-34-49-8
Operator Name: ARC Resources Ltd.
License Number: 0016166
License Date: 1958-11-04
License Status: Suspension
Spud Date: 1958-11-06
Final Drill Date: 1958-11-13
Well Total Depth: 1487.40 m
Surface Hole Latitude: 53.270614
Surface Hole Longitude: -115.077356

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-11-04 Obtained License
1958-11-13 Finished Drilling
1958-11-13 Well Mode changed to Drilled and Cased
1958-11-14 Perforation Treatment Performed - Bullet Perforation
1958-11-14 Production Casing Operation Performed
1958-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-11-22 Perforation Treatment Performed - Fractured
1958-12-01 Well Began Production
1958-12-01 Well Fluid changed to Crude Oil
1958-12-01 Well Mode changed to Flowing
1962-05-07 Well Fluid changed to Crude Oil
1962-05-07 Well Mode changed to Pumping
1987-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-30 Perforation Treatment Performed - Fractured
2016-12-01 Well Fluid changed to Crude Oil
2016-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-11-14 Bullet Perforation 1455.40 1456.90 13
1958-11-14 Bullet Perforation 1457.90 1459.70 13
1958-11-14 Bullet Perforation 1460.90 1461.80 13
1958-11-22 Acid Treatment 1455.40 1461.80 0
1958-11-22 Fracture 1455.40 1461.80 0
1987-06-29 Acid Treatment 1455.40 1461.80 0
1987-06-30 Fracture 1455.40 1461.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 962 0.0 0.0 0.0
1968 3951 0.0 0.0 0.0
1969 7507 0.0 0.0 0.0
1970 8499 0.0 0.0 0.0
1971 8543 0.0 0.0 0.0
1972 8307 0.0 0.0 0.0
1973 8615 0.0 0.0 0.0
1974 8543 0.0 0.0 0.0
1975 8635 0.0 0.0 0.0
1976 8737 0.0 0.0 0.0
1977 8447 0.0 0.0 0.0
1978 7695 0.0 0.0 0.0
1979 8047 0.0 0.0 0.0
1980 8044 0.0 0.0 0.0
1981 8451 0.0 0.0 0.0
1982 8233 0.0 0.0 0.0
1983 7896 0.0 0.0 0.0
1984 8643 0.0 0.0 0.0
1985 8649 0.0 0.0 0.0
1986 8715 0.0 0.0 0.0
1987 6613 0.0 0.0 0.0
1988 8679 0.0 0.0 0.0
1989 7095 0.0 0.0 0.0
1990 8343 0.0 0.0 0.0
1991 7631 0.0 0.0 0.0
1992 8345 0.0 0.0 0.0
1993 8732 0.0 0.0 0.0
1994 8580 0.0 0.0 0.0
1995 8581 0.0 0.0 0.0
1996 8515 0.0 0.0 0.0
1997 8672 0.0 0.0 0.0
1998 8600 0.0 0.0 0.0
1999 8700 0.0 0.0 0.0
2000 8581 0.0 0.0 0.0
2001 8458 0.0 0.0 0.0
2002 8711 0.0 0.0 0.0
2003 8711 0.0 0.0 0.0
2004 8408 0.0 0.0 0.0
2005 8397 0.0 0.0 0.0
2006 8606 0.0 0.0 0.0
2007 8075 0.0 0.0 0.0
2008 8495 0.0 0.0 0.0
2009 7886 0.0 0.0 0.0
2010 7852 0.0 0.0 0.0
2011 8663 0.0 0.0 0.0
2012 8471 0.0 0.0 0.0
2013 8099 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 2400 0.0 0.0 0.0

For data sources see[5]

References