X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495071006000

Well Details

Well ID: 0495071006000
Loading map...
Location: 00/06-10-049-07W5/0
Location Alias: 00/06-10-49-07 W5M
Location Alias 2: 00/06-10-049-07 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 07
Section: 10
County/Municipality: Brazeau County
Well Name: ARC PEM 6-10-49-7
Operator Name: ARC Resources Ltd.
License Number: 0010654
License Date: 1955-12-16
License Status: Suspension
Spud Date: 1956-01-04
Final Drill Date: 1956-01-15
Well Total Depth: 1430.10 m
Surface Hole Latitude: 53.212347
Surface Hole Longitude: -114.943141

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-12-16 Obtained License
1956-01-15 Finished Drilling
1956-01-15 Well Mode changed to Drilled and Cased
1956-01-16 Production Casing Operation Performed
1956-01-21 Perforation Treatment Performed - Jet Perforation
1956-02-03 Perforation Treatment Performed - Acid Wash - No Pressure
1956-02-03 Perforation Treatment Performed - Fractured
1956-02-06 Well Began Production
1956-02-06 Well Fluid changed to Crude Oil
1956-02-06 Well Mode changed to Flowing
1974-03-06 Well Fluid changed to Crude Oil
1974-03-06 Well Mode changed to Pumping
1976-04-23 Perforation Treatment Performed - Chemical Squeeze
1986-08-28 Perforation Treatment Performed - Fractured
2020-01-01 Well Fluid changed to Crude Oil
2020-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-01-21 Perforation 1388.70 1393.50 13
1956-02-03 Acid Wash 1388.70 1393.50 0
1956-02-03 Fracture 1388.70 1393.50 0
1976-04-23 Chemical Squeeze 1388.70 1393.50 0
1986-08-28 Fracture 1388.70 1393.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5424 0.0 0.0 0.0
1968 7440 0.0 0.0 0.0
1969 7821 0.0 0.0 0.0
1970 8635 0.0 0.0 0.0
1971 8742 0.0 0.0 0.0
1972 8642 0.0 0.0 0.0
1973 8634 0.0 0.0 0.0
1974 7715 0.0 0.0 0.0
1975 8283 0.0 0.0 0.0
1976 8737 0.0 0.0 0.0
1977 8759 0.0 0.0 0.0
1978 8753 0.0 0.0 0.0
1979 8759 0.0 0.0 0.0
1980 8472 0.0 0.0 0.0
1981 8688 0.0 0.0 0.0
1982 8725 0.0 0.0 0.0
1983 8613 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 8722 0.0 0.0 0.0
1986 8478 0.0 0.0 0.0
1987 8547 0.0 0.0 0.0
1988 8746 0.0 0.0 0.0
1989 8702 0.0 0.0 0.0
1990 8565 0.0 0.0 0.0
1991 8615 0.0 0.0 0.0
1992 8759 0.0 0.0 0.0
1993 8287 0.0 0.0 0.0
1994 8658 0.0 0.0 0.0
1995 8740 0.0 0.0 0.0
1996 8619 0.0 0.0 0.0
1997 8613 0.0 0.0 0.0
1998 8704 0.0 0.0 0.0
1999 8433 0.0 0.0 0.0
2000 8763 0.0 0.0 0.0
2001 8153 0.0 0.0 0.0
2002 8566 0.0 0.0 0.0
2003 8206 0.0 0.0 0.0
2004 8646 0.0 0.0 0.0
2005 8678 0.0 0.0 0.0
2006 8548 0.0 0.0 0.0
2007 8044 0.0 0.0 0.0
2008 8260 0.0 0.0 0.0
2009 8680 0.0 0.0 0.0
2010 8624 0.0 0.0 0.0
2011 8543 0.0 0.0 0.0
2012 8707 0.0 0.0 0.0
2013 8001 0.0 0.0 0.0
2014 7687 0.0 0.0 0.0
2015 7827 0.0 0.0 0.0
2016 8702 0.0 0.0 0.0
2017 2927 0.0 0.0 0.0
2018 7994 0.0 0.0 0.0
2019 7735 0.0 0.0 0.0

For data sources see[5]

References