If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495061911000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.25226,"lon":-114.893972,"icon":""}]} |
Location: 00/11-19-049-06W5/0 | |
Location Alias: 00/11-19-49-06 W5M | |
Location Alias 2: 00/11-19-049-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 06 | |
Section: 19 | |
County/Municipality: Brazeau County | |
Well Name: ARC HZ PEMBINA 11-19-49-6 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0457893 | |
License Date: 2013-07-05 | |
License Status: Issued | |
Spud Date: 2013-07-24 | |
Final Drill Date: 2013-08-02 | |
Well Total Depth: 3243.40 m | |
Surface Hole Latitude: 53.252260 | |
Surface Hole Longitude: -114.893972 |
Date | Event |
---|---|
2013-07-05 | Obtained License |
2013-07-24 | Surface Casing Operation Performed |
2013-07-25 | Direction Drilling Operation Performed - Deviate |
2013-07-25 | Direction Drilling Operation Performed - Horizontal |
2013-07-28 | Well Log Performed |
2013-07-31 | Intermediate Casing Operation Performed |
2013-08-02 | Finished Drilling |
2013-08-02 | Well Log Performed |
2013-08-02 | Well Mode changed to Drilled and Cased |
2013-08-03 | Liner Casing Operation Performed |
2013-08-04 | Perforation Treatment Performed - Open-Hole Completion |
2013-08-04 | Rig Released |
2013-08-22 | Well Log Performed |
2013-08-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-08-30 | Well Began Production |
2013-08-30 | Well Fluid changed to Crude Oil |
2013-08-30 | Well Mode changed to Flowing |
2013-09-26 | Well Fluid changed to Crude Oil |
2013-09-26 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-07-24 | Excalibur Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-07-25 | 816.90 | Deviate (5 - 79 degrees) |
2013-07-25 | 1532.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-08-04 | Open Hole/Barefoot Completion | 3231.00 | 3243.00 | 0 |
2013-08-28 | Multi-Stage Fracture | 2522.50 | 2522.60 | 0 |
2013-08-28 | Multi-Stage Fracture | 2431.50 | 2431.60 | 0 |
2013-08-28 | Multi-Stage Fracture | 2340.50 | 2340.60 | 0 |
2013-08-28 | Multi-Stage Fracture | 3228.50 | 3228.60 | 0 |
2013-08-28 | Multi-Stage Fracture | 3159.50 | 3159.60 | 0 |
2013-08-28 | Multi-Stage Fracture | 3068.50 | 3068.60 | 0 |
2013-08-28 | Multi-Stage Fracture | 2977.50 | 2977.60 | 0 |
2013-08-28 | Multi-Stage Fracture | 2886.50 | 2886.60 | 0 |
2013-08-28 | Multi-Stage Fracture | 2795.50 | 2795.60 | 0 |
2013-08-28 | Multi-Stage Fracture | 2704.50 | 2704.60 | 0 |
2013-08-28 | Multi-Stage Fracture | 2613.50 | 2613.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-08-28 | 2013-08-28 | 1,336 | 1,754 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 88.251 | N/A | |||
20/40 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 6.682 | N/A | ||
30/50 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 6.0257 | N/A | ||
40/70 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 2.4838 | N/A | ||
50/140 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 0.5036 | N/A | ||
B-1008 | Sanjel | Bactericide/Biocide | BNPD | 52-51-7 | 100 | 0.009 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.009 | N/A | ||||
SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.1765 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1765 | N/A | ||||
FRW-3 | Sanjel | Friction Reducer | Isoparaffinic Solvent | 64742-47-8 | 100 | 0.0447 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0447 | N/A | ||||
Surfactant | 68131-40-8 | 100 | 0.0447 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-08-22 | 2013-08-24 | Surface Water - Runoff | 1696 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 2119 | 0.0 | 0.0 | 0.0 |
2014 | 7214 | 0.0 | 0.0 | 0.0 |
2015 | 8053 | 0.0 | 0.0 | 0.0 |
2016 | 7775 | 0.0 | 0.0 | 0.0 |
2017 | 8315 | 0.0 | 0.0 | 0.0 |
2018 | 6944 | 0.0 | 0.0 | 0.0 |
2019 | 6360 | 0.0 | 0.0 | 0.0 |
2020 | 2160 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-08-04 | No Incident Encountered | 0.00 | 0.00 |
2013-09-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]