If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495053601000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.280243,"lon":-114.599569,"icon":""}]} |
Location: 00/01-36-049-05W5/0 | |
Location Alias: 00/01-36-49-05 W5M | |
Location Alias 2: 00/01-36-049-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 05 | |
Section: 36 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA HZ PEMBINA 1-36-49-5 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0479080 | |
License Date: 2016-02-22 | |
License Status: Issued | |
Spud Date: 2016-03-08 | |
Final Drill Date: 2016-03-14 | |
Well Total Depth: 3003.00 m | |
Surface Hole Latitude: 53.280243 | |
Surface Hole Longitude: -114.599569 |
Date | Event |
---|---|
2016-02-22 | Obtained License |
2016-03-09 | Surface Casing Operation Performed |
2016-03-10 | Direction Drilling Operation Performed - Deviate |
2016-03-11 | Direction Drilling Operation Performed - Horizontal |
2016-03-13 | Well Log Performed |
2016-03-14 | Finished Drilling |
2016-03-14 | Production Casing Operation Performed |
2016-03-14 | Well Mode changed to Drilled and Cased |
2016-03-15 | Rig Released |
2016-04-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-04-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-04-09 | Well Began Production |
2016-04-09 | Well Fluid changed to Crude Oil |
2016-04-09 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-03-09 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-03-10 | 391.50 | Deviate (5 - 79 degrees) |
2016-03-11 | 1533.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-04-05 | Multi-Stage Fracture | 2944.50 | 2945.30 | 0 |
2016-04-06 | Multi-Stage Fracture | 2429.00 | 2429.10 | 0 |
2016-04-06 | Multi-Stage Fracture | 2407.30 | 2408.10 | 0 |
2016-04-06 | Multi-Stage Fracture | 2353.60 | 2354.40 | 0 |
2016-04-06 | Multi-Stage Fracture | 2298.40 | 2299.20 | 0 |
2016-04-06 | Multi-Stage Fracture | 2242.60 | 2243.40 | 0 |
2016-04-06 | Multi-Stage Fracture | 2187.30 | 2188.10 | 0 |
2016-04-06 | Multi-Stage Fracture | 2131.00 | 2131.80 | 0 |
2016-04-06 | Multi-Stage Fracture | 2074.00 | 2074.80 | 0 |
2016-04-06 | Multi-Stage Fracture | 2016.90 | 2017.70 | 0 |
2016-04-06 | Multi-Stage Fracture | 1959.90 | 1960.70 | 0 |
2016-04-05 | Multi-Stage Fracture | 2901.70 | 2902.50 | 0 |
2016-04-06 | Multi-Stage Fracture | 1902.80 | 1903.60 | 0 |
2016-04-06 | Multi-Stage Fracture | 1845.70 | 1846.50 | 0 |
2016-04-06 | Multi-Stage Fracture | 1788.80 | 1789.60 | 0 |
2016-04-06 | Multi-Stage Fracture | 1731.80 | 1732.60 | 0 |
2016-04-06 | Multi-Stage Fracture | 1674.70 | 1675.50 | 0 |
2016-04-06 | Multi-Stage Fracture | 1617.70 | 1618.50 | 0 |
2016-04-06 | Multi-Stage Fracture | 1560.70 | 1561.50 | 0 |
2016-04-05 | Multi-Stage Fracture | 2859.80 | 2860.60 | 0 |
2016-04-05 | Multi-Stage Fracture | 2803.20 | 2804.00 | 0 |
2016-04-05 | Multi-Stage Fracture | 2747.30 | 2748.10 | 0 |
2016-04-05 | Multi-Stage Fracture | 2690.30 | 2691.10 | 0 |
2016-04-05 | Multi-Stage Fracture | 2634.00 | 2634.80 | 0 |
2016-04-05 | Multi-Stage Fracture | 2576.90 | 2577.70 | 0 |
2016-04-05 | Multi-Stage Fracture | 2520.00 | 2520.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-04-05 | 2016-04-06 | 1,207 | 2,179 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 83.5801 | N/A | |||
Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 11.2471 | N/A | ||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 4.8472 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0104 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0104 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0104 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0104 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0104 | N/A | ||||
CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1838 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1838 | N/A | ||||
FR-18 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.086 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.086 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.086 | N/A | ||||
S-17 | Trican | Surfactant | ethylene/propylene oxide polymer | Not Available | 100 | 0.0451 | N/A | |
water | Not Available | 100 | 0.0451 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-03-06 | 2016-04-01 | Oilfield Produced Water | 2179 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 6082 | 0.0 | 0.0 | 0.0 |
2017 | 8433 | 0.0 | 0.0 | 0.0 |
2018 | 8354 | 0.0 | 0.0 | 0.0 |
2019 | 8360 | 0.0 | 0.0 | 0.0 |
2020 | 2132 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-03-15 | No Incident Encountered | 0.00 | 0.00 |
2016-04-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]