X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495040616000

Well Details

Well ID: 0495040616000
Loading map...
Location: 00/16-06-049-04W5/0
Location Alias: 00/16-06-49-04 W5M
Location Alias 2: 00/16-06-049-04 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 04
Section: 06
County/Municipality: Brazeau County
Well Name: CREE KEYSTONE 16-6-49-4
Operator Name: ARC Resources Ltd.
License Number: 0013785
License Date: 1957-08-09
License Status: Suspension
Spud Date: 1957-08-19
Final Drill Date: 1957-08-27
Well Total Depth: 1328.90 m
Surface Hole Latitude: 53.205225
Surface Hole Longitude: -114.565558

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-08-09 Obtained License
1957-08-27 Finished Drilling
1957-08-27 Well Mode changed to Drilled and Cased
1957-08-29 Production Casing Operation Performed
1957-08-30 Perforation Treatment Performed - Acid Wash - No Pressure
1957-08-30 Perforation Treatment Performed - Bullet Perforation
1957-08-30 Perforation Treatment Performed - Fractured
1957-09-12 Well Began Production
1957-09-12 Well Fluid changed to Crude Oil
1957-09-12 Well Mode changed to Flowing
1958-02-06 Well Fluid changed to Crude Oil
1958-02-06 Well Mode changed to Pumping
1960-03-17 Perforation Treatment Performed - Abrasa-Jet Perforation
1960-03-17 Perforation Treatment Performed - Fractured
1979-07-19 Perforation Treatment Performed - Chemical Squeeze
1986-02-20 Perforation Treatment Performed - Fractured
2017-01-01 Well Fluid changed to Crude Oil
2017-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-08-30 Bullet Perforation 1295.70 1304.50 13
1957-08-30 Bullet Perforation 1300.90 1303.90 13
1957-08-30 Acid Wash 1295.70 1303.90 0
1957-08-30 Fracture 1295.70 1303.90 0
1960-03-17 Hydra Jet Perforation 1294.20 1297.80 0
1960-03-17 Fracture 1294.20 1304.50 0
1979-07-19 Chemical Squeeze 1294.20 1304.50 0
1986-02-20 Fracture 1294.20 1304.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6359 0.0 0.0 0.0
1968 7753 0.0 0.0 0.0
1969 8424 0.0 0.0 0.0
1970 8013 0.0 0.0 0.0
1971 7126 0.0 0.0 0.0
1972 8280 0.0 0.0 0.0
1973 8058 0.0 0.0 0.0
1974 8088 0.0 0.0 0.0
1975 8177 0.0 0.0 0.0
1976 8688 0.0 0.0 0.0
1977 7680 0.0 0.0 0.0
1978 8708 0.0 0.0 0.0
1979 8676 0.0 0.0 0.0
1980 8759 0.0 0.0 0.0
1981 8719 0.0 0.0 0.0
1982 8712 0.0 0.0 0.0
1983 8123 0.0 0.0 0.0
1984 8449 0.0 0.0 0.0
1985 8605 0.0 0.0 0.0
1986 8254 0.0 0.0 0.0
1987 8385 0.0 0.0 0.0
1988 8405 0.0 0.0 0.0
1989 8675 0.0 0.0 0.0
1990 8687 0.0 0.0 0.0
1991 8277 0.0 0.0 0.0
1992 8663 0.0 0.0 0.0
1993 8653 0.0 0.0 0.0
1994 8495 0.0 0.0 0.0
1995 8260 0.0 0.0 0.0
1996 4824 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 2328 0.0 0.0 0.0
1999 2208 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 6792 0.0 0.0 0.0
2002 8735 0.0 0.0 0.0
2003 8064 0.0 0.0 0.0
2004 8663 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8543 0.0 0.0 0.0
2008 7823 0.0 0.0 0.0
2009 8747 0.0 0.0 0.0
2010 8615 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 4487 0.0 0.0 0.0
2013 5472 0.0 0.0 0.0
2014 6564 0.0 0.0 0.0
2015 6004 0.0 0.0 0.0

For data sources see[5]

References