X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495040313020

Well Details

Well ID: 0495040313020
Loading map...
Location: 02/13-03-049-04W5/0
Location Alias: 02/13-03-49-04 W5M
Location Alias 2: 02/13-03-049-04 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 04
Section: 03
County/Municipality: Brazeau County
Well Name: SPARTAN OIL PEMBINA 13-3-49-4
Operator Name: Bonterra Energy Corp.
License Number: 0447546
License Date: 2012-08-02
License Status: Abandoned
Spud Date: 2012-08-24
Final Drill Date: 2012-08-29
Well Total Depth: 2545.00 m
Surface Hole Latitude: 53.193033
Surface Hole Longitude: -114.510038

For data sources see[1][2]

Well History

Date Event
2012-08-02 Obtained License
2012-08-25 Surface Casing Operation Performed
2012-08-26 Direction Drilling Operation Performed - Horizontal
2012-08-29 Finished Drilling
2012-08-29 Well Mode changed to Drilled and Cased
2012-08-31 Liner Casing Operation Performed
2012-08-31 Production Casing Operation Performed
2012-08-31 Rig Released
2012-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-29 Perforation Treatment Performed - Open-Hole Completion
2012-11-16 Well Began Production
2012-11-16 Well Fluid changed to Crude Oil
2012-11-16 Well Mode changed to Pumping
2016-10-03 Well Fluid changed to Crude Oil
2016-10-03 Well Mode changed to Suspended
2020-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-23 Plug Back Performed
2020-02-23 Well Fluid changed to Crude Oil
2020-02-23 Well Mode changed to Abandoned Zone
2020-04-13 Well Abandoned

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-24 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-26 952.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-29 Open Hole/Barefoot Completion 2528.00 2545.00 0
2012-09-29 Multi-Stage Fracture 1987.20 1987.30 0
2012-09-29 Multi-Stage Fracture 1931.20 1931.30 0
2012-09-29 Multi-Stage Fracture 1859.30 1859.40 0
2012-09-29 Multi-Stage Fracture 1802.90 1803.00 0
2012-09-29 Multi-Stage Fracture 1730.10 1730.20 0
2012-09-29 Multi-Stage Fracture 1670.90 1671.00 0
2012-09-29 Multi-Stage Fracture 1599.90 1600.00 0
2012-09-29 Multi-Stage Fracture 1541.90 1542.00 0
2012-09-29 Multi-Stage Fracture 1498.50 1498.60 0
2020-02-23 Packing Device Capped w/Cement 1340.00 1365.00 0
2012-09-29 Multi-Stage Fracture 2503.00 2503.10 0
2012-09-29 Multi-Stage Fracture 2441.40 2441.50 0
2012-09-29 Multi-Stage Fracture 2382.40 2382.50 0
2012-09-29 Multi-Stage Fracture 2309.60 2309.70 0
2012-09-29 Multi-Stage Fracture 2250.40 2250.50 0
2012-09-29 Multi-Stage Fracture 2191.10 2191.20 0
2012-09-29 Multi-Stage Fracture 2118.70 2118.80 0
2012-09-29 Multi-Stage Fracture 2059.50 2059.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 624 0.0 0.0 0.0
2013 8557 0.0 0.0 0.0
2014 6523 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-31 No Incident Encountered 0.00 0.00
2012-10-26 No Incident Encountered 0.00 0.00
2020-02-24 No Incident Encountered 0.00 0.00

For data sources see[8]

References