If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495040211002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.202049,"lon":-114.480902,"icon":""}]} |
| Location: 00/11-02-049-04W5/2 | |
| Location Alias: 00/11-02-49-04 W5M | |
| Location Alias 2: 00/11-02-049-04 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 04 | |
| Section: 02 | |
| County/Municipality: Leduc County | |
| Well Name: 1598385 Alberta PEMBINA 11-2-49-4 | |
| Operator Name: Bonterra Energy Corp. | |
| License Number: 0174915 | |
| License Date: 1995-01-13 | |
| License Status: Suspension | |
| Spud Date: 1995-01-17 | |
| Final Drill Date: 1995-01-23 | |
| Well Total Depth: 1725.00 m | |
| Surface Hole Latitude: 53.202049 | |
| Surface Hole Longitude: -114.480902 |
| Date | Event |
|---|---|
| 1995-01-13 | Obtained License |
| 1995-01-18 | Surface Casing Operation Performed |
| 1995-01-23 | Finished Drilling |
| 1995-01-23 | Well Mode changed to Drilled and Cased |
| 1995-01-24 | Drill Stem Test Performed |
| 1995-01-24 | Well Log Performed |
| 1995-01-25 | Drill Stem Test Performed |
| 1995-01-26 | Drill Stem Test Performed |
| 1995-01-28 | Production Casing Operation Performed |
| 1995-01-28 | Rig Released |
| 1995-02-09 | Perforation Treatment Performed - Jet Perforation |
| 1995-02-09 | Well Log Performed |
| 1995-02-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1995-02-14 | Plug Back Performed |
| 1995-02-15 | Perforation Treatment Performed - Jet Perforation |
| 1995-02-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1995-02-20 | Plug Back Performed |
| 1995-02-22 | Perforation Treatment Performed - Jet Perforation |
| 1995-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1995-03-30 | Perforation Treatment Performed - Fractured |
| 1995-03-30 | Well Log Performed |
| 1995-05-16 | Perforation Treatment Performed - Fractured |
| 1998-06-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-06-14 | Plug Back Performed |
| 1998-06-16 | Perforation Treatment Performed - Jet Perforation |
| 1998-06-16 | Well Log Performed |
| 1998-06-17 | Perforation Treatment Performed - Fractured |
| 1998-07-01 | Well Began Production |
| 1998-07-01 | Well Fluid changed to Crude Oil |
| 1998-07-01 | Well Mode changed to Pumping |
| 2008-11-16 | Well Fluid changed to Crude Oil |
| 2008-11-16 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1995-02-09 | Perforation | 1700.50 | 1703.50 | 13 |
| 1995-05-16 | Fracture | 1531.00 | 1533.00 | 0 |
| 1998-06-14 | Packing Device Capped w/Cement | 1512.00 | 1520.00 | 0 |
| 1998-06-16 | Perforation | 1233.00 | 1238.00 | 17 |
| 1998-06-17 | Fracture | 1233.00 | 1238.00 | 0 |
| 1995-02-10 | Acid Treatment | 1700.50 | 1703.50 | 0 |
| 1995-02-14 | Packing Device Capped w/Cement | 1697.70 | 1700.00 | 0 |
| 1995-02-15 | Perforation | 1691.00 | 1692.50 | 13 |
| 1995-02-17 | Acid Treatment | 1691.00 | 1692.50 | 0 |
| 1995-02-20 | Packing Device Capped w/Cement | 1674.00 | 1682.00 | 0 |
| 1995-02-22 | Perforation | 1531.00 | 1533.00 | 13 |
| 1995-03-30 | Fracture | 1531.00 | 1533.00 | 0 |
| 1995-03-30 | Acid Treatment | 1531.00 | 1533.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1998 | 696 | 0.0 | 0.0 | 0.0 |
| 1999 | 7776 | 0.0 | 0.0 | 0.0 |
| 2000 | 4977 | 0.0 | 0.0 | 0.0 |
| 2001 | 7856 | 0.0 | 0.0 | 0.0 |
| 2002 | 8112 | 0.0 | 0.0 | 0.0 |
| 2003 | 8361 | 0.0 | 0.0 | 0.0 |
| 2004 | 8519 | 0.0 | 0.0 | 0.0 |
| 2005 | 1536 | 0.0 | 0.0 | 0.0 |
| 2006 | 6863 | 0.0 | 0.0 | 0.0 |
| 2007 | 3792 | 0.0 | 0.0 | 0.0 |
For data sources see[5]