X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495033008000

Well Details

Well ID: 0495033008000
Loading map...
Location: 00/08-30-049-03W5/0
Location Alias: 00/08-30-49-03 W5M
Location Alias 2: 00/08-30-049-03 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 03
Section: 30
County/Municipality: Leduc County
Well Name: JOURNEY PEMBINA 8-30-49-3
Operator Name: Journey Energy Inc.
License Number: 0080392
License Date: 1980-01-14
License Status: Issued
Spud Date: 1980-03-18
Final Drill Date: 1980-03-23
Well Total Depth: 1707.20 m
Surface Hole Latitude: 53.255709
Surface Hole Longitude: -114.420983

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-01-14 Obtained License
1980-03-23 Finished Drilling
1980-03-24 Water Flow Occurred
1980-03-24 Well Log Performed
1980-03-26 Production Casing Operation Performed
1980-03-26 Well Mode changed to Drilled and Cased
1980-04-04 Drill Stem Test Performed
1980-04-05 Perforation Treatment Performed - Jet Perforation
1980-04-06 Perforation Treatment Performed - Cement Squeeze
1980-04-09 Drill Stem Test Performed
1980-04-10 Perforation Treatment Performed - Jet Perforation
1980-04-11 Drill Stem Test Performed
1980-04-12 Perforation Treatment Performed - Jet Perforation
1980-04-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-04-14 Perforation Treatment Performed - Jet Perforation
1980-04-14 Well Began Production
1980-04-14 Well Fluid changed to Crude Oil
1980-04-14 Well Mode changed to Flowing
1985-05-02 Well Began Injection
1985-05-02 Well Fluid changed to Water
1985-05-02 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-04-05 Perforation 869.00 875.00 7
1980-04-06 Cement Squeeze 869.00 875.00 0
1980-04-10 Perforation 1648.50 1650.00 7
1980-04-12 Perforation 1644.00 1647.00 7
1980-04-13 Packing Device Capped w/Cement 1638.00 1643.00 0
1980-04-14 Perforation 1629.70 1631.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 532 0.0 0.0 0.0
1981 831 0.0 0.0 0.0
1982 1543 0.0 0.0 0.0
1983 2944 0.0 0.0 0.0
1984 4178 0.0 0.0 0.0
1985 821 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-03-24 Water Flow 1705.00 0.00

For data sources see[6]

References