X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495030705000

Well Details

Well ID: 0495030705000
Loading map...
Location: 00/05-07-049-03W5/0
Location Alias: 00/05-07-49-03 W5M
Location Alias 2: 00/05-07-049-03 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 03
Section: 07
County/Municipality: Leduc County
Well Name: HEL ETAL HZ PEMBINA 5-7-49-3
Operator Name: Hitic Energy Ltd.
License Number: 0464823
License Date: 2014-02-07
License Status: Issued
Spud Date: 2014-03-05
Final Drill Date: 2014-03-14
Well Total Depth: 3007.00 m
Surface Hole Latitude: 53.209258
Surface Hole Longitude: -114.414970

For data sources see[1][2]

Well History

Date Event
2014-02-07 Obtained License
2014-03-06 Surface Casing Operation Performed
2014-03-07 Direction Drilling Operation Performed - Deviate
2014-03-09 Direction Drilling Operation Performed - Horizontal
2014-03-09 Well Log Performed
2014-03-11 Intermediate Casing Operation Performed
2014-03-14 Finished Drilling
2014-03-14 Well Log Performed
2014-03-14 Well Mode changed to Drilled and Cased
2014-03-15 Liner Casing Operation Performed
2014-03-17 Rig Released
2014-03-18 Well Log Performed
2014-03-25 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-25 Well Began Production
2014-03-25 Well Fluid changed to Crude Oil
2014-03-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-03-05 Ensign Drilling Inc. 320 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-03-07 777.00 Deviate (5 - 79 degrees)
2014-03-09 1480.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-25 Multi-Stage Fracture 2972.00 2972.10 0
2014-03-25 Multi-Stage Fracture 2301.00 2301.10 0
2014-03-25 Multi-Stage Fracture 2227.80 2227.90 0
2014-03-25 Multi-Stage Fracture 2154.70 2154.80 0
2014-03-25 Multi-Stage Fracture 2081.40 2081.50 0
2014-03-25 Multi-Stage Fracture 1996.60 1996.70 0
2014-03-25 Multi-Stage Fracture 1923.20 1923.30 0
2014-03-25 Multi-Stage Fracture 1850.20 1850.30 0
2014-03-25 Multi-Stage Fracture 1776.90 1777.00 0
2014-03-25 Multi-Stage Fracture 1703.50 1703.60 0
2014-03-25 Multi-Stage Fracture 2898.70 2898.80 0
2014-03-25 Multi-Stage Fracture 2825.40 2825.50 0
2014-03-25 Multi-Stage Fracture 2740.60 2740.70 0
2014-03-25 Multi-Stage Fracture 2667.20 2667.30 0
2014-03-25 Multi-Stage Fracture 2593.80 2593.90 0
2014-03-25 Multi-Stage Fracture 2520.60 2520.70 0
2014-03-25 Multi-Stage Fracture 2447.20 2447.30 0
2014-03-25 Multi-Stage Fracture 2373.90 2374.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-25 2014-03-25 1,191 1,710 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen 7727-37-9 100 1.9122 N/A
Water Not Available 100 80.7603 N/A
20/40 Sanjel Crystalline Silica 14808-60-7 100 10.35 N/A
30/50 Sanjel Crystalline Silica 14808-60-7 100 6.6104 N/A
B-1008 Sanjel Bactericide/Biocide BNPD 52-51-7 100 0.0127 N/A
Methyl Alcohol 67-56-1 100 0.0127 N/A
SCC-6L Sanjel Clay Control 1.6-Hexanediamine dihydrochloride 6055-52-3 100 0.1747 N/A
Non-Hazardous Ingredients Not Available 100 0.1747 N/A
FRW-3 Sanjel Friction Reducer Isoparaffinic Solvent 64742-47-8 100 0.0897 N/A
Non-Hazardous Ingredients Not Available 100 0.0897 N/A
Surfactant 68131-40-8 100 0.0897 N/A
NE-5 Sanjel Surfactant Alkyl benzenesulfonic acid 68584-22-5 100 0.0897 N/A
Diethylenetriamine 111-40-0 100 0.0897 N/A
Isopropyl Alcohol 67-63-0 100 0.0897 N/A
Non-Hazardous Ingredients Not Available 100 0.0897 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-03-21 2014-03-23 Surface Water - River 1870

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6401 0.0 0.0 0.0
2015 7429 0.0 0.0 0.0
2016 8278 0.0 0.0 0.0
2017 8391 0.0 0.0 0.0
2018 4861 0.0 0.0 0.0
2019 540 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-17 No Incident Encountered 0.00 0.00
2014-03-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References