If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495030608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.196374,"lon":-114.441467,"icon":""}]} |
Location: 00/08-06-049-03W5/0 | |
Location Alias: 00/08-06-49-03 W5M | |
Location Alias 2: 00/08-06-049-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 03 | |
Section: 06 | |
County/Municipality: Leduc County | |
Well Name: WHITECAP PEMBINA 8-6-49-3 | |
Operator Name: Whitecap Resources Inc. | |
License Number: 0415447 | |
License Date: 2009-12-11 | |
License Status: Issued | |
Spud Date: 2010-06-18 | |
Final Drill Date: 2010-06-29 | |
Well Total Depth: 2810.00 m | |
Surface Hole Latitude: 53.196374 | |
Surface Hole Longitude: -114.441467 |
Date | Event |
---|---|
2009-12-11 | Obtained License |
2010-06-20 | Surface Casing Operation Performed |
2010-06-21 | Direction Drilling Operation Performed - Horizontal |
2010-06-23 | Intermediate Casing Operation Performed |
2010-06-29 | Finished Drilling |
2010-06-29 | Well Mode changed to Drilled and Cased |
2010-06-30 | Liner Casing Operation Performed |
2010-07-02 | Rig Released |
2010-07-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-09-11 | Well Began Production |
2010-09-11 | Well Fluid changed to Crude Oil |
2010-09-11 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-06-21 | 976.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-07-06 | Multi-Stage Fracture | 2726.20 | 2726.30 | 0 |
2010-07-06 | Multi-Stage Fracture | 1958.90 | 1959.00 | 0 |
2010-07-06 | Multi-Stage Fracture | 1868.20 | 1868.30 | 0 |
2010-07-06 | Multi-Stage Fracture | 1778.90 | 1779.00 | 0 |
2010-07-06 | Multi-Stage Fracture | 1691.50 | 1691.60 | 0 |
2010-07-06 | Multi-Stage Fracture | 1612.60 | 1612.70 | 0 |
2010-07-06 | Multi-Stage Fracture | 1523.80 | 1523.90 | 0 |
2010-07-06 | Multi-Stage Fracture | 1432.20 | 1432.30 | 0 |
2010-07-06 | Multi-Stage Fracture | 2650.10 | 2650.20 | 0 |
2010-07-06 | Multi-Stage Fracture | 2559.70 | 2559.80 | 0 |
2010-07-06 | Multi-Stage Fracture | 2469.50 | 2469.60 | 0 |
2010-07-06 | Multi-Stage Fracture | 2378.80 | 2378.90 | 0 |
2010-07-06 | Multi-Stage Fracture | 2306.80 | 2306.90 | 0 |
2010-07-06 | Multi-Stage Fracture | 2206.20 | 2206.30 | 0 |
2010-07-06 | Multi-Stage Fracture | 2127.80 | 2127.90 | 0 |
2010-07-06 | Multi-Stage Fracture | 2036.70 | 2036.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2426 | 0.0 | 0.0 | 0.0 |
2011 | 8661 | 0.0 | 0.0 | 0.0 |
2012 | 8443 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8645 | 0.0 | 0.0 | 0.0 |
2015 | 8735 | 0.0 | 0.0 | 0.0 |
2016 | 8768 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8543 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[6]