X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263602000

Well Details

Well ID: 0494263602000
Loading map...
Location: 00/02-36-049-26W4/0
Location Alias: 00/02-36-49-26 W4M
Location Alias 2: 00/02-36-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 36
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 2-36-49-26
Operator Name: NEP Canada ULC
License Number: 0006473
License Date: 1953-05-20
License Status: Suspension
Spud Date: 1953-05-24
Final Drill Date: 1953-06-16
Well Total Depth: 1636.80 m
Surface Hole Latitude: 53.266869
Surface Hole Longitude: -113.668263

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-05-20 Obtained License
1953-06-09 Drill Stem Test Performed
1953-06-10 Drill Stem Test Performed
1953-06-15 Liner Casing Operation Performed
1953-06-16 Finished Drilling
1953-06-16 Well Mode changed to Drilled and Cased
1953-06-19 Perforation Treatment Performed - Jet Perforation
1953-06-29 Well Began Production
1953-06-29 Well Fluid changed to Crude Oil
1953-06-29 Well Mode changed to Flowing
1975-08-20 Perforation Treatment Performed - Cement Squeeze
1975-08-22 Perforation Treatment Performed - Jet Perforation
1975-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-04 Well Fluid changed to Crude Oil
1977-02-04 Well Mode changed to Pumping
1978-09-18 Perforation Treatment Performed - Cement Squeeze
1978-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-19 Perforation Treatment Performed - Jet Perforation
1985-09-01 Well Fluid changed to Crude Oil
1985-09-01 Well Mode changed to Suspended
1987-08-07 Well Fluid changed to Crude Oil
1987-08-07 Well Mode changed to Pumping
1987-11-12 Well Log Performed
1987-11-16 Perforation Treatment Performed - Cement Squeeze
1987-11-17 Perforation Treatment Performed - Jet Perforation
1987-11-17 Well Log Performed
1987-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-20 Perforation Treatment Performed - Cement Squeeze
1987-11-20 Well Log Performed
1987-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-24 Perforation Treatment Performed - Jet Perforation
1987-11-24 Well Log Performed
1987-11-25 Perforation Treatment Performed - Jet Perforation
1987-11-25 Well Log Performed
1987-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-13 Perforation Treatment Performed - Cement Squeeze
1994-12-14 Perforation Treatment Performed - Jet Perforation
1994-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-14 Perforation Treatment Performed - Jet Perforation
1995-09-15 Perforation Treatment Performed - Cement Squeeze
1995-09-20 Perforation Treatment Performed - Jet Perforation
1997-06-01 Well Fluid changed to Crude Oil
1997-06-01 Well Mode changed to Suspended
2002-06-24 Perforation Treatment Performed - Bridge Plug No Cement Required
2002-06-24 Plug Back Performed
2002-06-24 Well Fluid changed to Crude Oil
2002-06-24 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-06-19 Perforation 1633.10 1634.60 13
1987-11-18 Acid Treatment 1628.90 1629.00 0
1987-11-19 Acid Treatment 1628.90 1629.00 0
1987-11-20 Cement Squeeze 1628.90 1629.00 0
1987-11-24 Perforation 1627.00 1627.50 13
1987-11-24 Acid Treatment 1627.00 1627.50 0
1987-11-25 Perforation 1626.50 1627.00 13
1987-11-26 Acid Treatment 1626.50 1627.00 0
1994-12-13 Cement Squeeze 1626.50 1627.50 0
1994-12-14 Perforation 1624.60 1625.00 13
1994-12-15 Acid Treatment 1624.60 1625.00 0
1975-08-20 Cement Squeeze 1633.10 1634.60 0
1995-09-14 Perforation 1623.30 1623.60 13
1995-09-14 Perforation 1623.00 1623.60 13
1995-09-14 Acid Treatment 1623.00 1623.60 0
1995-09-15 Cement Squeeze 1623.00 1623.60 0
1995-09-20 Perforation 1622.00 1623.00 14
2002-06-24 Bridge Plug, No Cement 1612.40 1613.40 0
1975-08-22 Perforation 1631.60 1632.50 7
1975-08-25 Acid Treatment 1631.60 1632.50 0
1978-09-18 Cement Squeeze 1631.60 1632.50 0
1978-09-19 Perforation 1629.50 1630.10 7
1978-09-19 Acid Treatment 1629.50 1630.10 0
1987-11-16 Cement Squeeze 1629.50 1630.10 0
1987-11-17 Perforation 1628.90 1629.00 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3732 0.0 0.0 0.0
1968 3984 0.0 0.0 0.0
1969 3036 0.0 0.0 0.0
1970 2550 0.0 0.0 0.0
1971 2496 0.0 0.0 0.0
1972 4637 0.0 0.0 0.0
1973 8086 0.0 0.0 0.0
1974 8521 0.0 0.0 0.0
1975 7623 0.0 0.0 0.0
1976 8484 0.0 0.0 0.0
1977 7728 0.0 0.0 0.0
1978 7740 0.0 0.0 0.0
1979 7561 0.0 0.0 0.0
1980 8363 0.0 0.0 0.0
1981 7871 0.0 0.0 0.0
1982 8107 0.0 0.0 0.0
1983 8246 0.0 0.0 0.0
1984 5371 0.0 0.0 0.0
1985 1772 0.0 0.0 0.0
1987 1067 0.0 0.0 0.0
1988 8373 0.0 0.0 0.0
1989 8356 0.0 0.0 0.0
1990 8755 0.0 0.0 0.0
1991 8064 0.0 0.0 0.0
1992 8013 0.0 0.0 0.0
1993 8032 0.0 0.0 0.0
1994 6944 0.0 0.0 0.0
1995 7776 0.0 0.0 0.0
1996 8698 0.0 0.0 0.0
1997 3152 0.0 0.0 0.0

For data sources see[5]

References