X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263512000

Well Details

Well ID: 0494263512000
Loading map...
Location: 00/12-35-049-26W4/0
Location Alias: 00/12-35-49-26 W4M
Location Alias 2: 00/12-35-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 35
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 12-35-49-26
Operator Name: NEP Canada ULC
License Number: 0001681
License Date: 1950-06-29
License Status: Suspension
Spud Date: 1950-07-21
Final Drill Date: 1950-08-19
Well Total Depth: 1645.90 m
Surface Hole Latitude: 53.274087
Surface Hole Longitude: -113.704734

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-06-29 Obtained License
1950-08-10 Drill Stem Test Performed
1950-08-11 Drill Stem Test Performed
1950-08-14 Liner Casing Operation Performed
1950-08-19 Finished Drilling
1950-08-19 Well Mode changed to Drilled and Cased
1950-08-23 Perforation Treatment Performed - Acid Wash - No Pressure
1950-08-23 Perforation Treatment Performed - Jet Perforation
1950-08-23 Well Began Production
1950-08-23 Well Fluid changed to Crude Oil
1950-08-23 Well Mode changed to Flowing
1963-10-28 Perforation Treatment Performed - Cement Squeeze
1963-10-30 Perforation Treatment Performed - Jet Perforation
1963-10-30 Perforation Treatment Performed - Selective Jet Perforations
1963-11-03 Perforation Treatment Performed - Acid Wash - No Pressure
1964-01-10 Perforation Treatment Performed - Acid Wash - No Pressure
1973-04-17 Perforation Treatment Performed - Acid Wash - No Pressure
1981-04-01 Well Fluid changed to Crude Oil
1981-04-01 Well Mode changed to Suspended
1982-07-06 Perforation Treatment Performed - Selective Jet Perforations
1982-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-01 Well Fluid changed to Crude Oil
1982-12-01 Well Mode changed to Pumping
1983-10-25 Well Fluid changed to Crude Oil
1983-10-25 Well Mode changed to Suspended
1988-03-04 Perforation Treatment Performed - Cement Squeeze
1988-03-04 Well Log Performed
1988-03-09 Perforation Treatment Performed - Cement Squeeze
1988-03-09 Well Log Performed
1988-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-11 Perforation Treatment Performed - Jet Perforation
1988-03-11 Well Log Performed
1988-03-19 Well Fluid changed to Crude Oil
1988-03-19 Well Mode changed to Pumping
1992-07-15 Well Log Performed
1995-07-12 Perforation Treatment Performed - Cement Squeeze
1995-07-14 Perforation Treatment Performed - Jet Perforation
1995-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-01 Well Fluid changed to Crude Oil
1996-09-01 Well Mode changed to Suspended
1996-09-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-05 Perforation Treatment Performed - Jet Perforation
1996-09-05 Plug Back Performed
1996-09-05 Well Fluid changed to Crude Oil
1996-09-05 Well Mode changed to Abandoned Zone
1996-09-06 Perforation Treatment Performed - Jet Perforation
1998-05-07 Well Log Performed
1998-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-08 Perforation Treatment Performed - Jet Perforation
1998-05-08 Plug Back Performed
1998-05-08 Well Log Performed
1998-05-29 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-08-23 Perforation 1644.70 1645.60 13
1982-07-07 Acid Treatment 1642.10 1642.30 0
1988-03-04 Cement Squeeze 1636.80 1636.80 0
1988-03-09 Cement Squeeze 1642.10 1643.50 0
1988-03-11 Perforation 1637.00 1637.50 13
1988-03-11 Acid Treatment 1637.00 1637.50 0
1995-07-12 Cement Squeeze 1637.00 1637.50 0
1995-07-14 Perforation 1634.10 1634.40 13
1995-07-15 Acid Treatment 1634.10 1634.40 0
1996-09-05 Packing Device Capped w/Cement 1596.00 1604.00 0
1996-09-05 Perforation 1560.50 1564.30 13
1950-08-23 Acid Wash 1644.70 1645.60 0
1996-09-05 Perforation 1565.30 1570.00 13
1996-09-05 Perforation 1571.00 1575.30 13
1996-09-06 Perforation 1560.50 1575.30 13
1998-05-08 Packing Device Capped w/Cement 1524.00 1532.00 0
1998-05-08 Perforation 1217.00 1224.00 13
1998-05-29 Fracture 1217.00 1224.00 0
1963-10-28 Cement Squeeze 1643.80 1645.60 0
1963-10-30 Perforation 1642.90 1643.50 13
1963-10-30 Selective Jet Perforations 1636.80 1636.80 0
1963-11-03 Acid Wash 1636.80 1636.80 0
1964-01-10 Acid Wash 1642.90 1643.50 0
1973-04-17 Acid Wash 1642.90 1643.50 0
1982-07-06 Selective Jet Perforations 1642.10 1642.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 288 0.0 0.0 0.0
1969 264 0.0 0.0 0.0
1970 384 0.0 0.0 0.0
1971 3984 0.0 0.0 0.0
1972 1032 0.0 0.0 0.0
1973 4686 0.0 0.0 0.0
1974 8067 0.0 0.0 0.0
1975 6704 0.0 0.0 0.0
1978 1716 0.0 0.0 0.0
1979 8208 0.0 0.0 0.0
1980 8335 0.0 0.0 0.0
1981 2168 0.0 0.0 0.0
1982 3600 0.0 0.0 0.0
1983 5024 0.0 0.0 0.0
1988 6267 0.0 0.0 0.0
1989 8340 0.0 0.0 0.0
1990 8749 0.0 0.0 0.0
1991 8435 0.0 0.0 0.0
1992 8028 0.0 0.0 0.0
1993 8330 0.0 0.0 0.0
1994 8406 0.0 0.0 0.0
1995 6984 0.0 0.0 0.0
1996 4438 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References