X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263210000

Well Details

Well ID: 0494263210000
Loading map...
Location: 00/10-32-049-26W4/0
Location Alias: 00/10-32-49-26 W4M
Location Alias 2: 00/10-32-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 32
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 10-32-49-26
Operator Name: NEP Canada ULC
License Number: 0003191
License Date: 1951-07-16
License Status: Abandoned
Spud Date: 1951-07-22
Final Drill Date: 1951-08-23
Well Total Depth: 1652.00 m
Surface Hole Latitude: 53.274042
Surface Hole Longitude: -113.765853

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-07-16 Obtained License
1951-07-22 Direction Drilling Operation Performed - 98
1951-08-16 Drill Stem Test Performed
1951-08-17 Drill Stem Test Performed
1951-08-20 Liner Casing Operation Performed
1951-08-23 Finished Drilling
1951-08-23 Perforation Treatment Performed - Open-Hole Completion
1951-08-23 Well Mode changed to Drilled and Cased
1951-08-25 Well Began Production
1951-08-25 Well Fluid changed to Crude Oil
1951-08-25 Well Mode changed to Flowing
1958-12-06 Perforation Treatment Performed - Cement Squeeze
1958-12-20 Perforation Treatment Performed - Jet Perforation
1961-02-10 Well Fluid changed to Crude Oil
1961-02-10 Well Mode changed to Pumping
1971-06-04 Well Type changed to Observation
1984-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-23 Well Log Performed
1984-01-24 Perforation Treatment Performed - Cement Squeeze
1984-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-25 Perforation Treatment Performed - Jet Perforation
1984-01-25 Well Log Performed
1984-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-27 Perforation Treatment Performed - Jet Perforation
1984-01-27 Well Log Performed
1984-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-31 Perforation Treatment Performed - Jet Perforation
1984-01-31 Well Log Performed
1984-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-02 Perforation Treatment Performed - Jet Perforation
1984-02-02 Well Log Performed
1984-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-06 Perforation Treatment Performed - Jet Perforation
1984-02-08 Perforation Treatment Performed - Cement Squeeze
1984-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-15 Perforation Treatment Performed - Jet Perforation
1984-02-20 Well Fluid changed to Crude Oil
1984-02-20 Well Mode changed to Pumping
1985-11-01 Well Fluid changed to Crude Oil
1985-11-01 Well Mode changed to Suspended
1986-10-15 Well Fluid changed to Crude Oil
1986-10-15 Well Mode changed to Flowing
1986-12-01 Well Fluid changed to Crude Oil
1986-12-01 Well Mode changed to Suspended
1988-03-01 Well Fluid changed to Crude Oil
1988-03-01 Well Mode changed to Pumping
1997-01-01 Well Fluid changed to Crude Oil
1997-01-01 Well Mode changed to Suspended
1999-05-27 Well Log Performed
1999-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-05-28 Plug Back Performed
1999-05-28 Well Fluid changed to Crude Oil
1999-05-28 Well Log Performed
1999-05-28 Well Mode changed to Abandoned Zone
1999-05-29 Perforation Treatment Performed - Jet Perforation
2019-10-04 Well Log Performed
2019-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-05 Perforation Treatment Performed - Cement Squeeze
2019-10-05 Perforation Treatment Performed - Jet Perforation
2019-10-05 Plug Back Performed
2019-10-05 Well Log Performed
2019-10-10 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1951-07-22 1590.10 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-08-23 Open Hole/Barefoot Completion 1621.50 1652.00 0
1984-01-31 Perforation 1643.90 1644.10 10
1984-01-31 Acid Treatment 1643.90 1644.10 0
1984-02-02 Perforation 1642.40 1642.60 10
1984-02-02 Acid Treatment 1642.40 1642.60 0
1984-02-06 Perforation 1640.90 1641.10 10
1984-02-06 Acid Treatment 1640.90 1641.10 0
1984-02-08 Cement Squeeze 1640.90 1641.10 0
1984-02-15 Perforation 1640.60 1640.80 10
1984-02-15 Acid Treatment 1640.60 1640.80 0
1999-05-28 Packing Device Capped w/Cement 1622.00 1630.00 0
1958-12-06 Cement Squeeze 1609.30 1652.00 0
1999-05-29 Perforation 346.00 349.00 17
2019-10-05 Packing Device Capped w/Cement 1565.00 1573.00 0
2019-10-05 Perforation 378.00 379.00 13
2019-10-05 Cement Squeeze 378.00 379.00 0
2019-10-05 Packing Device Capped w/Cement 330.00 338.00 0
1958-12-20 Perforation 1649.60 1650.20 13
1984-01-20 Acid Treatment 1649.60 1650.20 0
1984-01-24 Cement Squeeze 1649.60 1650.20 0
1984-01-25 Perforation 1647.00 1647.20 10
1984-01-25 Acid Treatment 1647.00 1647.20 0
1984-01-27 Perforation 1645.90 1646.10 10
1984-01-27 Acid Treatment 1645.90 1646.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6447 0.0 0.0 0.0
1968 8497 0.0 0.0 0.0
1969 8759 0.0 0.0 0.0
1970 2827 0.0 0.0 0.0
1984 1511 0.0 0.0 0.0
1986 265 0.0 0.0 0.0
1988 7040 0.0 0.0 0.0
1989 8104 0.0 0.0 0.0
1990 8522 0.0 0.0 0.0
1991 8470 0.0 0.0 0.0
1992 7954 0.0 0.0 0.0
1993 8476 0.0 0.0 0.0
1994 8444 0.0 0.0 0.0
1995 8720 0.0 0.0 0.0
1996 6575 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-03 No Incident Encountered 0.00 0.00

For data sources see[7]

References