If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494262604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.252411,"lon":-113.704687,"icon":""}]} |
Location: 00/04-26-049-26W4/0 | |
Location Alias: 00/04-26-49-26 W4M | |
Location Alias 2: 00/04-26-049-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 26 | |
Section: 26 | |
County/Municipality: Leduc County | |
Well Name: HUDSON'S BAY CALMAR NO. 26-A-4 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0006426 | |
License Date: 1953-05-12 | |
License Status: RecCertified | |
Spud Date: 1953-07-01 | |
Final Drill Date: 1953-07-24 | |
Well Total Depth: 1630.70 m | |
Surface Hole Latitude: 53.252411 | |
Surface Hole Longitude: -113.704687 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-05-12 | Obtained License |
1953-07-24 | Finished Drilling |
1953-07-24 | Production Casing Operation Performed |
1953-07-24 | Well Mode changed to Drilled and Cased |
1953-07-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-07-28 | Perforation Treatment Performed - Bullet Perforation |
1953-07-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-07-29 | Perforation Treatment Performed - Jet Perforation |
1953-08-19 | Perforation Treatment Performed - Cement Squeeze |
1953-08-31 | Perforation Treatment Performed - Bullet Perforation |
1953-08-31 | Perforation Treatment Performed - Cement Squeeze |
1953-09-15 | Perforation Treatment Performed - Cement Squeeze |
1953-09-20 | Perforation Treatment Performed - Bullet Perforation |
1953-09-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-09-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-09-26 | Perforation Treatment Performed - Cement Squeeze |
1953-09-27 | Perforation Treatment Performed - Bullet Perforation |
1953-09-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-10-02 | Perforation Treatment Performed - Jet Perforation |
1953-10-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-10-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-10-17 | Well Began Production |
1953-10-17 | Well Fluid changed to Crude Oil |
1953-10-17 | Well Mode changed to Flowing |
1955-07-06 | Well Fluid changed to Crude Oil |
1955-07-06 | Well Mode changed to Pumping |
1959-08-03 | Well Fluid changed to Crude Oil |
1959-08-03 | Well Mode changed to Suspended |
1963-09-27 | Perforation Treatment Performed - Cement Plug |
1963-10-01 | Well Abandoned |
1963-10-01 | Well Fluid changed to Crude Oil |
1963-10-01 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-07-28 | Bullet Perforation | 1624.90 | 1626.70 | 13 |
1953-09-22 | Acid Treatment | 1618.80 | 1620.60 | 0 |
1953-09-23 | Acid Treatment | 1618.80 | 1620.60 | 0 |
1953-09-26 | Cement Squeeze | 1618.80 | 1620.60 | 0 |
1953-09-27 | Bullet Perforation | 1614.20 | 1616.00 | 0 |
1953-09-29 | Acid Treatment | 1614.20 | 1616.00 | 0 |
1953-09-30 | Acid Treatment | 1614.20 | 1616.00 | 0 |
1953-10-02 | Perforation | 1610.00 | 1611.80 | 13 |
1953-10-03 | Acid Treatment | 1610.00 | 1611.80 | 0 |
1953-10-04 | Acid Treatment | 1610.00 | 1611.80 | 0 |
1963-09-27 | Cement Plug | 1583.40 | 1630.70 | 0 |
1953-07-28 | Acid Treatment | 1624.90 | 1626.70 | 0 |
1953-07-29 | Perforation | 1618.80 | 1621.80 | 13 |
1953-07-29 | Acid Treatment | 1618.80 | 1621.80 | 0 |
1953-08-19 | Cement Squeeze | 1618.80 | 1621.80 | 0 |
1953-08-31 | Bullet Perforation | 1624.90 | 1625.50 | 13 |
1953-08-31 | Cement Squeeze | 1624.90 | 1626.70 | 0 |
1953-09-15 | Cement Squeeze | 1624.90 | 1626.70 | 0 |
1953-09-20 | Bullet Perforation | 1618.80 | 1620.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]