X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494252912002

Well Details

Well ID: 0494252912002
Loading map...
Location: 00/12-29-049-25W4/2
Location Alias: 00/12-29-49-25 W4M
Location Alias 2: 00/12-29-049-25 W4/02
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 29
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 12-29-49-25
Operator Name: NEP Canada ULC
License Number: 0006914
License Date: 1953-08-11
License Status: Suspension
Spud Date: 1953-09-29
Final Drill Date: 1953-10-22
Well Total Depth: 1630.40 m
Surface Hole Latitude: 53.259557
Surface Hole Longitude: -113.631615

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-08-11 Obtained License
1953-10-09 Drill Stem Test Performed
1953-10-18 Liner Casing Operation Performed
1953-10-21 Drill Stem Test Performed
1953-10-22 Finished Drilling
1953-10-25 Perforation Treatment Performed - Jet Perforation
1978-02-03 Perforation Treatment Performed - Cement Squeeze
1978-02-03 Perforation Treatment Performed - Jet Perforation
1978-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-29 Perforation Treatment Performed - Cement Squeeze
1978-04-04 Perforation Treatment Performed - Jet Perforation
1978-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-06-23 Perforation Treatment Performed - Cement Squeeze
1979-06-24 Perforation Treatment Performed - Jet Perforation
1979-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-17 Well Log Performed
1989-10-18 Perforation Treatment Performed - Cement Squeeze
1989-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-20 Perforation Treatment Performed - Jet Perforation
1989-10-20 Well Log Performed
1989-10-30 Perforation Treatment Performed - Cement Squeeze
1989-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-01 Perforation Treatment Performed - Jet Perforation
1989-11-01 Well Log Performed
1997-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-26 Well Log Performed
1997-11-27 Perforation Treatment Performed - Jet Perforation
1997-11-27 Well Log Performed
1997-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-03 Perforation Treatment Performed - Fractured
1998-09-23 Well Log Performed
1998-09-24 Perforation Treatment Performed - Jet Perforation
1998-09-25 Well Mode changed to Drilled and Cased
1999-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-26 Plug Back Performed
1999-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-27 Plug Back Performed
1999-11-29 Perforation Treatment Performed - Jet Perforation
2002-06-26 Perforation Treatment Performed - Cement Squeeze
2002-06-26 Plug Back Performed
2002-06-28 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-10-25 Perforation 1625.20 1626.70 13
1979-06-24 Perforation 1623.20 1623.40 6
1979-06-25 Acid Treatment 1623.20 1623.40 0
1989-10-18 Cement Squeeze 1623.20 1623.40 0
1989-10-20 Perforation 1622.10 1622.30 13
1989-10-20 Acid Treatment 1622.10 1622.30 0
1989-10-30 Cement Squeeze 1622.10 1622.30 0
1989-11-01 Perforation 1621.30 1621.40 13
1989-11-01 Acid Treatment 1621.30 1621.40 0
1997-11-26 Packing Device Capped w/Cement 1603.00 1611.00 0
1997-11-27 Perforation 1496.00 1502.00 14
1978-02-03 Cement Squeeze 1625.20 1626.70 0
1997-11-28 Acid Treatment 1496.00 1502.00 0
1997-12-03 Fracture 1496.00 1502.00 0
1998-09-24 Perforation 1582.50 1583.50 20
1999-11-26 Packing Device Capped w/Cement 1560.00 1568.00 0
1999-11-27 Packing Device Capped w/Cement 1482.00 1490.00 0
1999-11-29 Perforation 1298.50 1302.50 14
2002-06-26 Cement Squeeze 1298.50 1302.50 0
2002-06-28 Perforation 1496.00 1502.00 17
1978-02-03 Perforation 1622.80 1623.10 7
1978-02-07 Acid Treatment 1622.80 1623.10 0
1978-03-29 Cement Squeeze 1622.80 1623.10 0
1978-04-04 Perforation 1624.20 1624.40 7
1978-04-05 Acid Treatment 1624.20 1624.40 0
1979-06-22 Acid Treatment 1624.20 1624.40 0
1979-06-23 Cement Squeeze 1624.20 1624.40 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1999-11-26 No Incident Encountered 0.00 0.00
2018-03-09 No Incident Encountered 0.00 0.00

For data sources see[5]

References