If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494251915000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.248643,"lon":-113.643947,"icon":""}]} |
Location: 00/15-19-049-25W4/0 | |
Location Alias: 00/15-19-49-25 W4M | |
Location Alias 2: 00/15-19-049-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 25 | |
Section: 19 | |
County/Municipality: Leduc County | |
Well Name: DEWAR NO. 3 WELL | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0002008 | |
License Date: 1950-09-11 | |
License Status: RecCertified | |
Spud Date: 1950-09-11 | |
Final Drill Date: 1950-10-04 | |
Well Total Depth: 1597.80 m | |
Surface Hole Latitude: 53.248643 | |
Surface Hole Longitude: -113.643947 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1950-09-11 | Obtained License |
1950-10-02 | Drill Stem Test Performed |
1950-10-04 | Drill Stem Test Performed |
1950-10-04 | Finished Drilling |
1950-10-04 | Well Mode changed to Drilled and Cased |
1950-10-06 | Drill Stem Test Performed |
1950-10-08 | Drill Stem Test Performed |
1950-10-13 | Production Casing Operation Performed |
1950-11-06 | Perforation Treatment Performed - Open-Hole Completion |
1950-11-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1950-11-25 | Well Began Production |
1950-11-25 | Well Fluid changed to Crude Oil |
1950-11-25 | Well Mode changed to Flowing |
1957-08-20 | Well Fluid changed to Crude Oil |
1957-08-20 | Well Mode changed to Pumping |
1963-09-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1963-09-02 | Perforation Treatment Performed - Bullet Perforation |
1963-09-04 | Perforation Treatment Performed - Acid Wash - No Pressure |
1967-09-15 | Perforation Treatment Performed - Cement Plug |
1967-09-24 | Well Abandoned |
1967-09-24 | Well Fluid changed to Crude Oil |
1967-09-24 | Well Mode changed to Abandoned |
2016-10-22 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1950-11-06 | Open Hole/Barefoot Completion | 1584.70 | 1597.80 | 0 |
1950-11-24 | Acid Treatment | 1584.70 | 1597.80 | 0 |
1963-09-02 | Packing Device Capped w/Cement | 1580.70 | 1580.70 | 0 |
1963-09-02 | Bullet Perforation | 1575.80 | 1578.90 | 13 |
1963-09-04 | Acid Wash | 1575.80 | 1578.90 | 0 |
1967-09-15 | Cement Plug | 1510.30 | 1580.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]