X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494210412000

Well Details

Well ID: 0494210412000
Loading map...
Location: 00/12-04-049-21W4/0
Location Alias: 00/12-04-49-21 W4M
Location Alias 2: 00/12-04-049-21 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 21
Section: 04
County/Municipality: Camrose County
Well Name: ANGLO ET AL JOARCAM IN 12-4-49-21
Operator Name: Shell Canada Limited
License Number: 0008090
License Date: 1954-06-04
License Status: RecCertified
Spud Date: 1954-06-13
Final Drill Date: 1954-06-20
Well Total Depth: 1015.00 m
Surface Hole Latitude: 53.202056
Surface Hole Longitude: -113.021636

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-06-04 Obtained License
1954-06-20 Drill Stem Test Performed
1954-06-20 Finished Drilling
1954-06-21 Production Casing Operation Performed
1954-07-19 Perforation Treatment Performed - Jet Perforation
1954-09-20 Well Mode changed to Drilled and Cased
1958-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-08-27 Well Began Injection
1958-08-27 Well Fluid changed to Water
1958-08-27 Well Type changed to Disposal
1958-11-21 Perforation Treatment Performed - Fractured
1967-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-12-12 Perforation Treatment Performed - Jet Perforation
1968-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-05-28 Perforation Treatment Performed - Acid Wash - No Pressure
1970-06-02 Perforation Treatment Performed - Cement Plug
1970-06-02 Well Abandoned
1970-06-02 Well Fluid changed to Water
1970-06-02 Well Mode changed to Abandoned
1970-06-02 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-07-19 Perforation 997.90 998.50 26
1958-08-21 Acid Treatment 997.90 998.50 0
1958-08-27 Acid Treatment 997.90 998.50 0
1958-11-21 Fracture 997.90 998.50 0
1967-12-12 Perforation 998.20 1001.30 7
1967-12-12 Acid Treatment 998.20 1001.30 0
1968-05-28 Acid Treatment 997.90 1001.30 0
1968-05-28 Acid Wash 997.90 1001.30 0
1970-06-02 Cement Plug 970.20 1006.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0

For data sources see[5]

References