X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494171006000

Well Details

Well ID: 0494171006000
Loading map...
Location: 00/06-10-049-17W4/0
Location Alias: 00/06-10-49-17 W4M
Location Alias 2: 00/06-10-049-17 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 17
Section: 10
County/Municipality: Beaver County
Well Name: PINE CLIFF BRUCE 6-10-49-17
Operator Name: Pine Cliff Energy Ltd.
License Number: 0049501
License Date: 1974-03-29
License Status: Abandoned
Spud Date: 1974-03-29
Final Drill Date: 1974-04-02
Well Total Depth: 1085.10 m
Surface Hole Latitude: 53.211575
Surface Hole Longitude: -112.409146

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-03-29 Obtained License
1974-04-02 Finished Drilling
1974-04-02 Production Casing Operation Performed
1974-04-25 Well Mode changed to Drilled and Cased
1974-05-26 Perforation Treatment Performed - Jet Perforation
1974-10-18 Perforation Treatment Performed - Acid Wash - No Pressure
1974-10-18 Perforation Treatment Performed - Cement Squeeze
1974-10-20 Perforation Treatment Performed - Jet Perforation
1974-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-12-03 Well Began Production
1974-12-03 Well Fluid changed to Gas
1974-12-03 Well Mode changed to Flowing
1980-01-01 Well Fluid changed to Gas
1980-01-01 Well Mode changed to Suspended
1980-06-01 Well Fluid changed to Gas
1980-06-01 Well Mode changed to Flowing
1980-12-01 Well Fluid changed to Gas
1980-12-01 Well Mode changed to Suspended
2000-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-20 Plug Back Performed
2000-08-22 Well Abandoned
2000-08-22 Well Fluid changed to Gas
2000-08-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-05-26 Perforation 814.70 817.50 7
1974-10-18 Acid Wash 814.70 817.50 0
1974-10-18 Cement Squeeze 814.70 817.50 0
1974-10-20 Perforation 798.00 800.40 7
1974-10-20 Perforation 807.70 812.00 7
1974-10-21 Acid Treatment 798.00 812.00 0
2000-08-20 Packing Device Capped w/Cement 782.00 790.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 666 0.0 0.0 0.0
1975 8554 0.0 0.0 0.0
1976 6847 0.0 0.0 0.0
1977 2856 0.0 0.0 0.0
1978 4285 0.0 0.0 0.0
1979 3849 0.0 0.0 0.0
1980 1077 0.0 0.0 0.0

For data sources see[5]

References