X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494163511000

Well Details

Well ID: 0494163511000
Loading map...
Location: 00/11-35-049-16W4/0
Location Alias: 00/11-35-49-16 W4M
Location Alias 2: 00/11-35-049-16 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 16
Section: 35
County/Municipality: Beaver County
Well Name: VOYAGER BRUCE 11-35-49-16
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0059282
License Date: 1976-07-21
License Status: RecCertified
Spud Date: 1976-07-20
Final Drill Date: 1976-07-23
Well Total Depth: 991.20 m
Surface Hole Latitude: 53.274495
Surface Hole Longitude: -112.238183

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-07-21 Obtained License
1976-07-22 Drill Stem Test Performed
1976-07-23 Finished Drilling
1976-07-23 Well Mode changed to Drilled and Cased
1976-07-24 Production Casing Operation Performed
1976-07-30 Perforation Treatment Performed - Jet Perforation
1976-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-16 Perforation Treatment Performed - Fractured
1976-11-01 Well Began Production
1976-11-01 Well Fluid changed to Gas
1976-11-01 Well Mode changed to Flowing
1993-06-01 Well Fluid changed to Gas
1993-06-01 Well Mode changed to Suspended
2001-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-28 Plug Back Performed
2001-05-29 Perforation Treatment Performed - Jet Perforation
2001-05-29 Well Log Performed
2001-05-30 Perforation Treatment Performed - Remedial Casing
2001-06-05 Well Abandoned
2001-06-05 Well Fluid changed to Gas
2001-06-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-07-30 Perforation 723.30 724.80 10
1976-07-31 Acid Treatment 723.30 724.80 0
1976-08-16 Fracture 723.30 724.80 0
2001-05-28 Packing Device Capped w/Cement 705.00 713.00 0
2001-05-29 Perforation 225.00 225.90 13
2001-05-30 Remedial Casing Cementing 225.00 225.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1302 0.0 0.0 0.0
1977 8209 0.0 0.0 0.0
1978 6731 0.0 0.0 0.0
1979 8309 0.0 0.0 0.0
1980 8203 0.0 0.0 0.0
1981 6581 0.0 0.0 0.0
1982 7547 0.0 0.0 0.0
1983 5141 0.0 0.0 0.0
1984 3825 0.0 0.0 0.0
1985 3314 0.0 0.0 0.0
1986 806 0.0 0.0 0.0
1987 1040 0.0 0.0 0.0
1988 2722 0.0 0.0 0.0
1989 2909 0.0 0.0 0.0
1990 1506 0.0 0.0 0.0
1991 4505 0.0 0.0 0.0
1992 1274 0.0 0.0 0.0

For data sources see[5]

References