X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494121002005

Well Details

Well ID: 0494121002005
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 00/02-10-049-12W4/5
Location Alias: 00/02-10-49-12 W4M
Location Alias 2: 00/02-10-049-12 W4/05
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 12
Section: 10
County/Municipality: Beaver County
Well Name: PINE CLIFF VIK-KINS 2-10-49-12
Operator Name: Pine Cliff Energy Ltd.
License Number: 0296359
License Date: 2003-11-18
License Status: Issued
Spud Date: 2004-01-08
Final Drill Date: 2004-01-11
Well Total Depth: 848.00 m
Surface Hole Latitude: 53.207023
Surface Hole Longitude: -111.673496

For data sources see[1][2]

Well History

Date Event
2003-11-18 Obtained License
2004-01-09 Surface Casing Operation Performed
2004-01-10 Production Casing Operation Performed
2004-01-11 Finished Drilling
2004-01-11 Well Log Performed
2004-01-11 Well Mode changed to Drilled and Cased
2004-01-12 Rig Released
2004-01-12 Well Log Performed
2004-01-18 Perforation Treatment Performed - Jet Perforation
2004-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-20 Perforation Treatment Performed - Jet Perforation
2004-01-20 Plug Back Performed
2004-01-22 Perforation Treatment Performed - Fractured
2004-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-04 Perforation Treatment Performed - Jet Perforation
2004-02-04 Plug Back Performed
2004-02-11 Perforation Treatment Performed - Chemical Squeeze
2009-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-04 Plug Back Performed
2009-08-05 Perforation Treatment Performed - Jet Perforation
2009-08-05 Well Log Performed
2010-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-17 Plug Back Performed
2010-11-18 Perforation Treatment Performed - Jet Perforation
2010-11-18 Well Log Performed
2010-11-27 Perforation Treatment Performed - Fractured
2010-11-27 Well Fluid changed to Gas
2010-11-27 Well Mode changed to Testing
2010-11-29 Well Fluid changed to Gas
2010-11-29 Well Mode changed to Test Completed
2011-02-04 Well Began Production
2011-02-04 Well Fluid changed to Gas
2011-02-04 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-01-18 Perforation 758.00 759.50 20
2010-11-17 Packing Device Capped w/Cement 670.00 678.00 0
2010-11-18 Perforation 484.00 487.00 13
2010-11-27 Fracture 484.00 487.00 0
2004-01-20 Packing Device Capped w/Cement 752.00 755.00 0
2004-01-20 Perforation 742.00 744.50 20
2004-01-22 Fracture 742.00 744.50 0
2004-02-04 Packing Device Capped w/Cement 724.00 727.00 0
2004-02-04 Perforation 717.50 718.50 20
2004-02-11 Chemical Squeeze 717.50 718.50 0
2009-08-04 Packing Device Capped w/Cement 706.00 714.00 0
2009-08-05 Perforation 683.30 683.70 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 46 0.0 0.0 0.0
2011 7941 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8420 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8711 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References

BESbswy