If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0494121002005 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 00/02-10-049-12W4/5 | |
| Location Alias: 00/02-10-49-12 W4M | |
| Location Alias 2: 00/02-10-049-12 W4/05 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 4 | |
| Range: 12 | |
| Section: 10 | |
| County/Municipality: Beaver County | |
| Well Name: PINE CLIFF VIK-KINS 2-10-49-12 | |
| Operator Name: Pine Cliff Energy Ltd. | |
| License Number: 0296359 | |
| License Date: 2003-11-18 | |
| License Status: Issued | |
| Spud Date: 2004-01-08 | |
| Final Drill Date: 2004-01-11 | |
| Well Total Depth: 848.00 m | |
| Surface Hole Latitude: 53.207023 | |
| Surface Hole Longitude: -111.673496 |
| Date | Event |
|---|---|
| 2003-11-18 | Obtained License |
| 2004-01-09 | Surface Casing Operation Performed |
| 2004-01-10 | Production Casing Operation Performed |
| 2004-01-11 | Finished Drilling |
| 2004-01-11 | Well Log Performed |
| 2004-01-11 | Well Mode changed to Drilled and Cased |
| 2004-01-12 | Rig Released |
| 2004-01-12 | Well Log Performed |
| 2004-01-18 | Perforation Treatment Performed - Jet Perforation |
| 2004-01-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-01-20 | Perforation Treatment Performed - Jet Perforation |
| 2004-01-20 | Plug Back Performed |
| 2004-01-22 | Perforation Treatment Performed - Fractured |
| 2004-02-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-02-04 | Perforation Treatment Performed - Jet Perforation |
| 2004-02-04 | Plug Back Performed |
| 2004-02-11 | Perforation Treatment Performed - Chemical Squeeze |
| 2009-08-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-08-04 | Plug Back Performed |
| 2009-08-05 | Perforation Treatment Performed - Jet Perforation |
| 2009-08-05 | Well Log Performed |
| 2010-11-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2010-11-17 | Plug Back Performed |
| 2010-11-18 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-18 | Well Log Performed |
| 2010-11-27 | Perforation Treatment Performed - Fractured |
| 2010-11-27 | Well Fluid changed to Gas |
| 2010-11-27 | Well Mode changed to Testing |
| 2010-11-29 | Well Fluid changed to Gas |
| 2010-11-29 | Well Mode changed to Test Completed |
| 2011-02-04 | Well Began Production |
| 2011-02-04 | Well Fluid changed to Gas |
| 2011-02-04 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-01-18 | Perforation | 758.00 | 759.50 | 20 |
| 2010-11-17 | Packing Device Capped w/Cement | 670.00 | 678.00 | 0 |
| 2010-11-18 | Perforation | 484.00 | 487.00 | 13 |
| 2010-11-27 | Fracture | 484.00 | 487.00 | 0 |
| 2004-01-20 | Packing Device Capped w/Cement | 752.00 | 755.00 | 0 |
| 2004-01-20 | Perforation | 742.00 | 744.50 | 20 |
| 2004-01-22 | Fracture | 742.00 | 744.50 | 0 |
| 2004-02-04 | Packing Device Capped w/Cement | 724.00 | 727.00 | 0 |
| 2004-02-04 | Perforation | 717.50 | 718.50 | 20 |
| 2004-02-11 | Chemical Squeeze | 717.50 | 718.50 | 0 |
| 2009-08-04 | Packing Device Capped w/Cement | 706.00 | 714.00 | 0 |
| 2009-08-05 | Perforation | 683.30 | 683.70 | 17 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 46 | 0.0 | 0.0 | 0.0 |
| 2011 | 7941 | 0.0 | 0.0 | 0.0 |
| 2012 | 8783 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8420 | 0.0 | 0.0 | 0.0 |
| 2015 | 8759 | 0.0 | 0.0 | 0.0 |
| 2016 | 8711 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]