X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494011211AA0

Well Details

Well ID: 0494011211AA0
Loading map...
Location: AA/11-12-049-01W4/0
Location Alias: AA/11-12-49-01 W4M
Location Alias 2: AA/11-12-049-01 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 01
Section: 12
County/Municipality: County of Vermilion River
Well Name: MOBIL-GC ET AL LLOYD EX 11AI-12-49-1
Operator Name: ExxonMobil Canada Ltd.
License Number: 0056084M
License Date: 1975-12-04
License Status: RecCertified
Spud Date: 1974-06-16
Final Drill Date: 1974-06-18
Well Total Depth: 603.50 m
Surface Hole Latitude: 53.213376
Surface Hole Longitude: -110.019191

For data sources see[1][2]

Well History

Date Event
1974-06-18 Finished Drilling
1974-06-18 Production Casing Operation Performed
1974-06-18 Well Log Performed
1974-06-18 Well Mode changed to Drilled and Cased
1974-07-01 Perforation Treatment Performed - Jet Perforation
1974-08-01 Well Began Production
1974-08-01 Well Fluid changed to Crude Oil
1974-08-01 Well Mode changed to Pumping
1975-12-04 Obtained License
1976-01-22 Well Log Performed
1977-02-16 Well Fluid changed to Crude Oil
1977-02-16 Well Mode changed to Suspended
1978-06-30 Well Began Injection
1978-06-30 Well Fluid changed to Air
1978-06-30 Well Type changed to Injection
1980-01-01 Well Fluid changed to Air
1980-01-01 Well Mode changed to Suspended
1980-01-01 Well Type changed to Injection
1986-03-14 Well Fluid changed to Air
1986-03-14 Well Type changed to Injection
1987-03-10 Well Fluid changed to Air
1987-03-10 Well Mode changed to Suspended
1987-03-10 Well Type changed to Injection
1987-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-09-01 Plug Back Performed
1987-09-01 Well Abandoned
1987-09-01 Well Fluid changed to Air
1987-09-01 Well Mode changed to Abandoned
1987-09-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-07-01 Perforation 580.60 582.80 13
1974-07-01 Perforation 584.60 588.90 13
1987-09-01 Packing Device Capped w/Cement 577.00 577.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 3614 0.0 0.0 0.0
1975 7871 0.0 0.0 0.0
1976 8331 0.0 0.0 0.0
1977 864 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 8711 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0

For data sources see[5]

References