If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494011209AA0 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.213373,"lon":-110.007389,"icon":""}]} |
Location: AA/09-12-049-01W4/0 | |
Location Alias: AA/09-12-49-01 W4M | |
Location Alias 2: AA/09-12-049-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 01 | |
Section: 12 | |
County/Municipality: County of Vermilion River | |
Well Name: MOBIL-GC ET AL LLOYD EX A9A-12-49-1 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0056084J | |
License Date: 1974-06-12 | |
License Status: Abandoned | |
Spud Date: 1974-08-08 | |
Final Drill Date: 1974-08-09 | |
Well Total Depth: 603.50 m | |
Surface Hole Latitude: 53.213373 | |
Surface Hole Longitude: -110.007389 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1974-06-12 | Obtained License |
1974-08-09 | Finished Drilling |
1974-08-09 | Well Mode changed to Drilled and Cased |
1974-08-11 | Production Casing Operation Performed |
1974-09-15 | Perforation Treatment Performed - Jet Perforation |
1974-09-15 | Well Began Production |
1974-09-15 | Well Fluid changed to Crude Oil |
1974-09-15 | Well Mode changed to Pumping |
1977-02-17 | Well Log Performed |
1989-04-01 | Well Fluid changed to Crude Oil |
1989-04-01 | Well Mode changed to Suspended |
1993-05-03 | Perforation Treatment Performed - Cement Squeeze |
1993-05-03 | Plug Back Performed |
1993-10-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-10-18 | Well Abandoned |
1993-10-18 | Well Fluid changed to Crude Oil |
1993-10-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1974-09-15 | Perforation | 573.90 | 577.80 | 13 |
1993-05-03 | Cement Squeeze | 573.90 | 577.80 | 0 |
1993-10-18 | Packing Device Capped w/Cement | 553.30 | 561.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1974 | 404 | 0.0 | 0.0 | 0.0 |
1975 | 4651 | 0.0 | 0.0 | 0.0 |
1976 | 7318 | 0.0 | 0.0 | 0.0 |
1977 | 8467 | 0.0 | 0.0 | 0.0 |
1978 | 8663 | 0.0 | 0.0 | 0.0 |
1979 | 8375 | 0.0 | 0.0 | 0.0 |
1980 | 6327 | 0.0 | 0.0 | 0.0 |
1981 | 7611 | 0.0 | 0.0 | 0.0 |
1982 | 2971 | 0.0 | 0.0 | 0.0 |
1983 | 4456 | 0.0 | 0.0 | 0.0 |
1984 | 6989 | 0.0 | 0.0 | 0.0 |
1985 | 8079 | 0.0 | 0.0 | 0.0 |
1986 | 8684 | 0.0 | 0.0 | 0.0 |
1987 | 8703 | 0.0 | 0.0 | 0.0 |
1988 | 8775 | 0.0 | 0.0 | 0.0 |
1989 | 1440 | 0.0 | 0.0 | 0.0 |
For data sources see[5]