If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494011208AB2 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.209745,"lon":-110.010174,"icon":""}]} |
Location: AB/08-12-049-01W4/2 | |
Location Alias: AB/08-12-49-01 W4M | |
Location Alias 2: AB/08-12-049-01 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 01 | |
Section: 12 | |
County/Municipality: County of Vermilion River | |
Well Name: BARCOMP LLOYD 8B-12-49-1 | |
Operator Name: Barcomp Petroleum Ltd. | |
License Number: 0056084I | |
License Date: 1975-09-11 | |
License Status: RecCertified | |
Spud Date: 1975-10-31 | |
Final Drill Date: 1975-11-04 | |
Well Total Depth: 591.30 m | |
Surface Hole Latitude: 53.209745 | |
Surface Hole Longitude: -110.010174 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-09-11 | Obtained License |
1975-11-04 | Finished Drilling |
1975-11-04 | Perforation Treatment Performed - Open-Hole Completion |
1975-11-04 | Well Mode changed to Drilled and Cased |
1975-11-05 | Rig Released |
1976-03-20 | Well Began Production |
1976-03-20 | Well Fluid changed to Crude Oil |
1976-03-20 | Well Mode changed to Pumping |
1977-05-24 | Perforation Treatment Performed - Open-Hole Completion |
1977-06-02 | Well Log Performed |
1977-10-01 | Well Fluid changed to Crude Oil |
1977-10-01 | Well Mode changed to Suspended |
1977-10-20 | Liner Casing Operation Performed |
1977-10-20 | Perforation Treatment Performed - Cement Squeeze |
1977-10-20 | Perforation Treatment Performed - Jet Perforation |
1978-12-01 | Well Began Injection |
1978-12-01 | Well Fluid changed to Air |
1978-12-01 | Well Type changed to Injection |
1987-03-10 | Well Fluid changed to Air |
1987-03-10 | Well Mode changed to Suspended |
1987-03-10 | Well Type changed to Injection |
1987-10-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-10-05 | Plug Back Performed |
1987-10-05 | Well Abandoned |
1987-10-05 | Well Fluid changed to Air |
1987-10-05 | Well Mode changed to Abandoned |
1987-10-05 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-11-04 | Open Hole/Barefoot Completion | 577.30 | 582.20 | 0 |
1977-05-24 | Open Hole/Barefoot Completion | 577.30 | 591.30 | 0 |
1977-10-20 | Cement Squeeze | 577.30 | 591.30 | 0 |
1977-10-20 | Perforation | 579.70 | 588.30 | 13 |
1987-10-05 | Packing Device Capped w/Cement | 545.00 | 545.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 6624 | 0.0 | 0.0 | 0.0 |
1977 | 5847 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]