If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494011207AD0 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.211886,"lon":-110.01465,"icon":""}]} |
Location: AD/07-12-049-01W4/0 | |
Location Alias: AD/07-12-49-01 W4M | |
Location Alias 2: AD/07-12-049-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 01 | |
Section: 12 | |
County/Municipality: County of Vermilion River | |
Well Name: BARCOMP LLOYD 7DXI-12-49-1 | |
Operator Name: Barcomp Petroleum Ltd. | |
License Number: 0054894G | |
License Date: 1975-09-11 | |
License Status: RecCertified | |
Spud Date: 1975-10-01 | |
Final Drill Date: 1975-10-02 | |
Well Total Depth: 601.90 m | |
Surface Hole Latitude: 53.211886 | |
Surface Hole Longitude: -110.014650 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-09-11 | Obtained License |
1975-10-02 | Finished Drilling |
1975-10-02 | Production Casing Operation Performed |
1975-10-02 | Well Mode changed to Drilled and Cased |
1975-10-20 | Perforation Treatment Performed - Jet Perforation |
1976-02-04 | Well Began Production |
1976-02-04 | Well Fluid changed to Crude Oil |
1976-02-04 | Well Mode changed to Pumping |
1978-11-01 | Well Fluid changed to Crude Oil |
1978-11-01 | Well Mode changed to Suspended |
1981-06-30 | Well Began Injection |
1981-06-30 | Well Fluid changed to Air |
1981-06-30 | Well Type changed to Injection |
1987-03-10 | Well Fluid changed to Air |
1987-03-10 | Well Mode changed to Suspended |
1987-03-10 | Well Type changed to Injection |
1987-09-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-09-22 | Plug Back Performed |
1987-09-22 | Well Abandoned |
1987-09-22 | Well Fluid changed to Air |
1987-09-22 | Well Mode changed to Abandoned |
1987-09-22 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-10-20 | Perforation | 577.00 | 585.10 | 13 |
1987-09-22 | Packing Device Capped w/Cement | 564.20 | 564.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 7242 | 0.0 | 0.0 | 0.0 |
1977 | 8317 | 0.0 | 0.0 | 0.0 |
1978 | 7295 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]