If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494011203AC0 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.208088,"lon":-110.023627,"icon":""}]} |
Location: AC/03-12-049-01W4/0 | |
Location Alias: AC/03-12-49-01 W4M | |
Location Alias 2: AC/03-12-049-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 01 | |
Section: 12 | |
County/Municipality: County of Vermilion River | |
Well Name: MOBIL-GC ET AL LLOYD EX 3CXI-12-49-1 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0055034C | |
License Date: 1975-09-19 | |
License Status: RecCertified | |
Spud Date: 1975-11-09 | |
Final Drill Date: 1975-11-11 | |
Well Total Depth: 603.50 m | |
Surface Hole Latitude: 53.208088 | |
Surface Hole Longitude: -110.023627 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-09-19 | Obtained License |
1975-11-11 | Finished Drilling |
1975-11-11 | Production Casing Operation Performed |
1975-11-11 | Well Mode changed to Drilled and Cased |
1975-11-15 | Perforation Treatment Performed - Jet Perforation |
1976-04-30 | Well Began Production |
1976-04-30 | Well Fluid changed to Crude Oil |
1976-04-30 | Well Mode changed to Pumping |
1977-03-01 | Well Fluid changed to Crude Oil |
1977-03-01 | Well Mode changed to Suspended |
1978-06-01 | Well Began Injection |
1978-06-01 | Well Fluid changed to Air |
1978-06-01 | Well Type changed to Injection |
1987-03-10 | Well Fluid changed to Air |
1987-03-10 | Well Mode changed to Suspended |
1987-03-10 | Well Type changed to Injection |
1987-09-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-09-25 | Plug Back Performed |
1987-09-25 | Well Abandoned |
1987-09-25 | Well Fluid changed to Air |
1987-09-25 | Well Mode changed to Abandoned |
1987-09-25 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-11-15 | Perforation | 578.50 | 579.70 | 13 |
1975-11-15 | Perforation | 583.40 | 585.20 | 13 |
1987-09-25 | Packing Device Capped w/Cement | 574.00 | 574.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 5065 | 0.0 | 0.0 | 0.0 |
1977 | 1344 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 720 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]