X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494010706000

Well Details

Well ID: 0494010706000
Loading map...
Location: 00/06-07-049-01W4/0
Location Alias: 00/06-07-49-01 W4M
Location Alias 2: 00/06-07-049-01 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 01
Section: 07
County/Municipality: County of Vermilion River
Well Name: HUSKY LLOYDMINSTER 6-7-49-1
Operator Name: Husky Oil Operations Limited
License Number: 0169684
License Date: 1994-08-19
License Status: Suspension
Spud Date: 1994-09-15
Final Drill Date: 1994-09-17
Well Total Depth: 725.00 m
Surface Hole Latitude: 53.210223
Surface Hole Longitude: -110.142333

For data sources see[1][2]

Well History

Date Event
1994-08-19 Obtained License
1994-09-16 Surface Casing Operation Performed
1994-09-17 Finished Drilling
1994-09-17 Well Log Performed
1994-09-17 Well Mode changed to Drilled and Cased
1994-09-18 Production Casing Operation Performed
1994-09-18 Rig Released
1994-10-24 Perforation Treatment Performed - Jet Perforation
1996-03-13 Perforation Treatment Performed - Cement Squeeze
1996-03-13 Plug Back Performed
1996-03-18 Perforation Treatment Performed - Jet Perforation
1996-04-27 Well Began Production
1996-04-27 Well Fluid changed to Crude Oil
1996-04-27 Well Mode changed to Pumping
1997-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-13 Plug Back Performed
1997-06-13 Well Fluid changed to Crude Oil
1997-06-13 Well Mode changed to Abandoned Zone
1997-06-15 Perforation Treatment Performed - Jet Perforation
2009-04-01 Perforation Treatment Performed - Cement Squeeze
2009-04-01 Plug Back Performed
2009-04-08 Well Fluid changed to Crude Oil
2009-04-08 Well Mode changed to Pumping
2016-12-20 Well Fluid changed to Crude Oil
2016-12-20 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-10-24 Perforation 585.00 587.00 13
1994-10-24 Perforation 601.50 604.00 13
1994-10-24 Perforation 608.00 610.00 13
1996-03-13 Cement Squeeze 585.00 587.00 0
1996-03-18 Perforation 601.50 605.00 13
1996-03-18 Perforation 608.00 611.00 13
1997-06-13 Packing Device Capped w/Cement 578.50 581.50 0
1997-06-15 Perforation 545.50 549.00 13
2009-04-01 Cement Squeeze 545.50 549.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 5352 0.0 0.0 0.0
1997 2291 0.0 0.0 0.0
2009 3022 0.0 0.0 0.0
2010 6609 0.0 0.0 0.0
2011 8443 0.0 0.0 0.0
2012 4598 0.0 0.0 0.0
2013 5381 0.0 0.0 0.0
2014 1666 0.0 0.0 0.0
2015 24 0.0 0.0 0.0

For data sources see[5]

References