If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494010102AB0 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.19349,"lon":-110.017682,"icon":""}]} |
Location: AB/02-01-049-01W4/0 | |
Location Alias: AB/02-01-49-01 W4M | |
Location Alias 2: AB/02-01-049-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 01 | |
Section: 01 | |
County/Municipality: County of Vermilion River | |
Well Name: MOBIL-GC ET AL 2CX LLOYD EX 2-1-49-1 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0097115 | |
License Date: 1982-08-23 | |
License Status: RecCertified | |
Spud Date: 1982-11-16 | |
Final Drill Date: 1982-11-18 | |
Well Total Depth: 632.00 m | |
Surface Hole Latitude: 53.193490 | |
Surface Hole Longitude: -110.017682 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-08-23 | Obtained License |
1982-11-18 | Finished Drilling |
1982-11-18 | Well Mode changed to Drilled and Cased |
1982-11-19 | Well Log Performed |
1982-11-20 | Production Casing Operation Performed |
1982-12-15 | Perforation Treatment Performed - Jet Perforation |
1983-01-03 | Well Began Production |
1983-01-03 | Well Fluid changed to Crude Oil |
1983-01-03 | Well Mode changed to Pumping |
1987-07-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-07-29 | Plug Back Performed |
1987-07-29 | Well Abandoned |
1987-07-29 | Well Fluid changed to Crude Oil |
1987-07-29 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-12-15 | Perforation | 576.00 | 579.00 | 13 |
1982-12-15 | Perforation | 580.20 | 582.20 | 13 |
1987-07-29 | Packing Device Capped w/Cement | 574.80 | 574.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 3983 | 0.0 | 0.0 | 0.0 |
1984 | 6810 | 0.0 | 0.0 | 0.0 |
1985 | 827 | 0.0 | 0.0 | 0.0 |
1986 | 1435 | 0.0 | 0.0 | 0.0 |
1987 | 2880 | 0.0 | 0.0 | 0.0 |
For data sources see[5]