X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485160912002

Well Details

Well ID: 0485160912002
Loading map...
Location: 00/12-09-048-16W5/2
Location Alias: 00/12-09-48-16 W5M
Location Alias 2: 00/12-09-048-16 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 16
Section: 09
County/Municipality: Yellowhead County
Well Name: CVE PECO 2-9-48-16
Operator Name: Cenovus Energy Inc.
License Number: 0475881
License Date: 2015-06-23
License Status: Amended
Spud Date: 2015-10-22
Final Drill Date: 2015-11-23
Well Total Depth: 6040.00 m
Surface Hole Latitude: 53.115312
Surface Hole Longitude: -116.249161

For data sources see[1][2]

Well History

Date Event
2015-06-23 Obtained License
2015-10-23 Surface Casing Operation Performed
2015-10-29 Lost Circulation Occurred
2015-11-04 Intermediate Casing Operation Performed
2015-11-06 Direction Drilling Operation Performed - Deviate
2015-11-08 Direction Drilling Operation Performed - Horizontal
2015-11-17 Direction Drilling Operation Performed - Horizontal
2015-11-23 Finished Drilling
2015-11-23 Well Log Performed
2015-11-23 Well Mode changed to Drilled and Cased
2015-11-25 Liner Casing Operation Performed
2015-11-25 Perforation Treatment Performed - Open-Hole Completion
2015-11-28 Rig Released
2015-12-15 Well Fluid changed to Gas
2015-12-15 Well Mode changed to Testing
2015-12-18 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-25 Well Began Production
2016-01-25 Well Fluid changed to Gas
2016-01-25 Well Mode changed to Flowing
2018-08-02 Well Fluid changed to Gas
2018-08-02 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-11-06 2606.10 Deviate (5 - 79 degrees)
2015-11-08 3023.40 Horizontal
2015-11-17 4558.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-11-25 Open Hole/Barefoot Completion 6035.00 6040.00 0
2015-12-18 Multi-Stage Fracture 5362.70 5363.60 0
2015-12-18 Multi-Stage Fracture 5244.90 5245.80 0
2015-12-19 Multi-Stage Fracture 5168.10 5169.00 0
2015-12-19 Multi-Stage Fracture 5034.90 5035.70 0
2015-12-19 Multi-Stage Fracture 4929.40 4930.20 0
2015-12-19 Multi-Stage Fracture 4895.30 4896.10 0
2015-12-19 Multi-Stage Fracture 4791.90 4792.70 0
2015-12-19 Multi-Stage Fracture 4660.00 4660.80 0
2015-12-19 Multi-Stage Fracture 4526.70 4527.60 0
2015-12-19 Multi-Stage Fracture 4421.90 4422.80 0
2015-12-18 Multi-Stage Fracture 5995.30 5996.60 0
2015-12-19 Multi-Stage Fracture 4288.80 4289.60 0
2015-12-19 Multi-Stage Fracture 4154.20 4155.10 0
2015-12-19 Multi-Stage Fracture 4048.90 4049.70 0
2015-12-19 Multi-Stage Fracture 3928.60 3929.40 0
2015-12-19 Multi-Stage Fracture 3824.50 3825.40 0
2015-12-19 Multi-Stage Fracture 3707.70 3708.50 0
2015-12-19 Multi-Stage Fracture 3617.30 3618.10 0
2015-12-19 Multi-Stage Fracture 3540.60 3541.40 0
2015-12-19 Multi-Stage Fracture 3450.60 3451.40 0
2015-12-19 Multi-Stage Fracture 3301.90 3302.70 0
2015-12-18 Multi-Stage Fracture 5941.90 5942.70 0
2015-12-19 Multi-Stage Fracture 3238.90 3239.70 0
2015-12-19 Multi-Stage Fracture 3120.40 3121.30 0
2015-12-18 Multi-Stage Fracture 5865.40 5866.20 0
2015-12-18 Multi-Stage Fracture 5718.00 5718.80 0
2015-12-18 Multi-Stage Fracture 5669.40 5670.20 0
2015-12-18 Multi-Stage Fracture 5578.00 5578.90 0
2015-12-18 Multi-Stage Fracture 5487.50 5488.40 0
2015-12-18 Multi-Stage Fracture 5411.30 5412.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-12-18 2015-12-19 2,927 1,520 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 40.6727 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 24.119 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0394 N/A
Methanol 67-56-1 100 0.0394 N/A
Water 7732-18-5 100 0.0394 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0066 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.0926 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 34.4909 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.2196 N/A
Oxyalkylated alcohol 9014 100 0.2196 N/A
Petroleum distillates 64742-47-8 100 0.2196 N/A
Polyacrylate 9014 100 0.2196 N/A
Flo-Back 30 Baker Hughes Surfactant Cocamido propyl betaine 61789-40-0 100 0.3587 N/A
Non-hazardous Not Available 100 0.3587 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 264 0.0 0.0 0.0
2016 8079 0.0 0.0 0.0
2017 8508 0.0 0.0 0.0
2018 8377 0.0 0.0 0.0
2019 7677 0.0 0.0 0.0
2020 2088 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-10-29 Lost Circulation 2560.00 2560.00
2015-12-31 No Incident Encountered 0.00 0.00

For data sources see[8]

References