X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485133616000

Well Details

Well ID: 0485133616000
Loading map...
Location: 00/16-36-048-13W5/0
Location Alias: 00/16-36-48-13 W5M
Location Alias 2: 00/16-36-048-13 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 13
Section: 36
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 16-36-48-13
Operator Name: Cenovus Energy Inc.
License Number: 0121087
License Date: 1986-01-06
License Status: Abandoned
Spud Date: 1986-01-18
Final Drill Date: 1986-03-27
Well Total Depth: 3242.00 m
Surface Hole Latitude: 53.191242
Surface Hole Longitude: -115.758709

For data sources see[1][2]

Well History

Date Event
1986-01-06 Obtained License
1986-01-23 Surface Casing Operation Performed
1986-02-24 Direction Drilling Operation Performed - Deviate
1986-03-12 Well Log Performed
1986-03-13 Well Log Performed
1986-03-16 Intermediate Casing Operation Performed
1986-03-27 Finished Drilling
1986-03-27 Well Log Performed
1986-03-28 Well Log Performed
1986-03-30 Liner Casing Operation Performed
1986-04-01 Rig Released
1986-04-01 Well Mode changed to Drilled and Cased
1989-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-12-12 Well Log Performed
1989-12-13 Perforation Treatment Performed - Jet Perforation
1989-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-07 Well Log Performed
1990-04-08 Perforation Treatment Performed - Jet Perforation
1990-04-08 Well Log Performed
1990-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-04 Perforation Treatment Performed - Jet Perforation
1997-07-04 Well Log Performed
1997-07-06 Perforation Treatment Performed - Cement Squeeze
1997-07-13 Well Log Performed
1997-07-18 Perforation Treatment Performed - Jet Perforation
1997-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-06-22 Well Log Performed
2012-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-22 Plug Back Performed
2012-06-22 Well Mode changed to Abandoned Zone
2012-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-24 Perforation Treatment Performed - Jet Perforation
2012-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-25 Perforation Treatment Performed - Jet Perforation
2012-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-26 Perforation Treatment Performed - Remedial Casing
2012-10-20 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1986-02-24 2756.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-12-12 Packing Device Capped w/Cement 2918.50 2926.50 0
1990-04-08 Perforation 3007.00 3014.00 20
1990-04-08 Perforation 3032.00 3044.00 20
1990-04-09 Acid Treatment 2887.00 3044.00 0
1990-04-11 Acid Treatment 3032.00 3044.00 0
1990-04-12 Acid Treatment 2936.00 3014.00 0
1990-04-13 Acid Treatment 2887.00 2912.00 0
1997-07-04 Perforation 2649.00 2650.00 13
1997-07-04 Perforation 2590.00 2591.00 13
1997-07-06 Cement Squeeze 2649.00 2650.00 0
1997-07-06 Cement Squeeze 2590.00 2591.00 0
1989-12-13 Perforation 2905.00 2912.00 16
1997-07-06 Cement Squeeze 2905.00 3044.00 0
1997-07-18 Perforation 2619.50 2623.00 13
1997-09-26 Acid Treatment 2619.50 2623.00 0
1997-11-30 Acid Treatment 2619.50 2623.00 0
2005-10-26 Acid Treatment 2619.50 2623.00 0
2012-06-22 Packing Device Capped w/Cement 2859.00 2867.00 0
2012-06-22 Packing Device Capped w/Cement 2607.00 2615.00 0
2012-06-23 Packing Device Capped w/Cement 2577.00 2585.00 0
2012-09-24 Perforation 2568.00 2569.00 17
2012-09-25 Packing Device Capped w/Cement 2555.00 2563.00 0
1989-12-14 Acid Treatment 2905.00 2912.00 0
2012-09-25 Perforation 609.00 611.00 17
2012-09-26 Remedial Casing Cementing 609.00 611.00 0
2012-09-26 Packing Device Capped w/Cement 593.00 603.00 0
1990-04-08 Perforation 2887.00 2894.00 16
1990-04-08 Perforation 2926.00 2927.50 16
1990-04-08 Perforation 2927.50 2930.00 20
1990-04-08 Perforation 2936.00 2939.00 20
1990-04-08 Perforation 2959.00 2963.00 20
1990-04-08 Perforation 2999.40 3004.00 20

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-20 No Incident Encountered 0.00 0.00
2012-10-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References