If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485123516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.173979,"lon":-115.639132,"icon":""}]} |
Location: 00/16-35-048-12W5/0 | |
Location Alias: 00/16-35-48-12 W5M | |
Location Alias 2: 00/16-35-048-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 12 | |
Section: 35 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK HZ PEMBINA 16-35-48-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0485890 | |
License Date: 2017-10-17 | |
License Status: Issued | |
Spud Date: 2017-11-28 | |
Final Drill Date: 2017-12-09 | |
Well Total Depth: 3764.00 m | |
Surface Hole Latitude: 53.173979 | |
Surface Hole Longitude: -115.639132 |
Date | Event |
---|---|
2017-10-17 | Obtained License |
2017-11-29 | Surface Casing Operation Performed |
2017-12-01 | Direction Drilling Operation Performed - Deviate |
2017-12-01 | Well Log Performed |
2017-12-02 | Intermediate Casing Operation Performed |
2017-12-04 | Direction Drilling Operation Performed - Horizontal |
2017-12-09 | Finished Drilling |
2017-12-09 | Well Log Performed |
2017-12-09 | Well Mode changed to Drilled and Cased |
2017-12-10 | Well Log Performed |
2017-12-11 | Perforation Treatment Performed - Open-Hole Completion |
2017-12-11 | Production Casing Operation Performed |
2017-12-11 | Rig Released |
2018-01-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-01-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-01-30 | Well Began Production |
2018-01-30 | Well Fluid changed to Crude Oil |
2018-01-30 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-11-28 | Precision Drilling Corporation | 183 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-12-01 | 1561.00 | Deviate (5 - 79 degrees) |
2017-12-04 | 2133.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-12-11 | Open Hole/Barefoot Completion | 3759.00 | 3764.00 | 0 |
2018-01-11 | Multi-Stage Fracture | 3420.00 | 3420.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3381.00 | 3381.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3342.00 | 3342.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3303.00 | 3303.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3264.00 | 3264.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3225.00 | 3225.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3186.00 | 3186.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3147.00 | 3147.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3108.00 | 3108.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3069.00 | 3069.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3732.00 | 3732.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3030.00 | 3030.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 2991.00 | 2991.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2952.00 | 2952.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2913.00 | 2913.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2874.00 | 2874.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2835.00 | 2835.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2796.00 | 2796.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2757.00 | 2757.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2718.00 | 2718.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2679.00 | 2679.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3693.00 | 3693.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2640.00 | 2640.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2601.00 | 2601.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2562.00 | 2562.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2523.00 | 2523.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2484.00 | 2484.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2445.00 | 2445.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2406.00 | 2406.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2367.00 | 2367.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2328.00 | 2328.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2289.00 | 2289.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3654.00 | 3654.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2250.00 | 2250.10 | 0 |
2018-01-12 | Multi-Stage Fracture | 2211.00 | 2211.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3615.00 | 3615.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3576.00 | 3576.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3537.00 | 3537.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3498.00 | 3498.10 | 0 |
2018-01-11 | Multi-Stage Fracture | 3459.00 | 3459.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-01-11 | 2018-01-12 | 1,947 | 6,211 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 95.3113 | N/A | |||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 3.0889 | N/A | ||
40/70 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.5997 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0107 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0107 | N/A | ||||
ELEFR-3A | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.115 | N/A | |
Tergitol 15-S-20 | 68131-40-8 | 100 | 0.115 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0974 | N/A | |
Methanol | 67-56-1 | 100 | 0.0974 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0974 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-01-06 | 2018-01-11 | Surface Water - Runoff | 6210 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 7618 | 0.0 | 0.0 | 0.0 |
2019 | 8741 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-12-11 | No Incident Encountered | 0.00 | 0.00 |
2018-01-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]