X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485123515000

Well Details

Well ID: 0485123515000
Loading map...
Location: 00/15-35-048-12W5/0
Location Alias: 00/15-35-48-12 W5M
Location Alias 2: 00/15-35-048-12 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 35
County/Municipality: Yellowhead County
Well Name: RIDGEBACK HZ PEMBINA 15-35-48-12
Operator Name: Ridgeback Resources Inc.
License Number: 0485891
License Date: 2017-10-17
License Status: Issued
Spud Date: 2017-12-12
Final Drill Date: 2017-12-20
Well Total Depth: 3955.00 m
Surface Hole Latitude: 53.173250
Surface Hole Longitude: -115.638573

For data sources see[1][2]

Well History

Date Event
2017-10-17 Obtained License
2017-12-12 Surface Casing Operation Performed
2017-12-13 Intermediate Casing Operation Performed
2017-12-15 Direction Drilling Operation Performed - Deviate
2017-12-16 Direction Drilling Operation Performed - Horizontal
2017-12-20 Finished Drilling
2017-12-20 Well Log Performed
2017-12-20 Well Mode changed to Drilled and Cased
2017-12-21 Well Log Performed
2017-12-22 Perforation Treatment Performed - Open-Hole Completion
2017-12-22 Production Casing Operation Performed
2017-12-22 Rig Released
2018-01-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-30 Well Began Production
2018-01-30 Well Fluid changed to Crude Oil
2018-01-30 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-12-12 Precision Drilling Corporation 183 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-12-15 1436.30 Deviate (5 - 79 degrees)
2017-12-16 2296.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-22 Open Hole/Barefoot Completion 3949.00 3955.00 0
2018-01-16 Multi-Stage Fracture 3609.00 3609.10 0
2018-01-16 Multi-Stage Fracture 3570.00 3570.10 0
2018-01-16 Multi-Stage Fracture 3531.00 3531.10 0
2018-01-16 Multi-Stage Fracture 3492.00 3492.10 0
2018-01-16 Multi-Stage Fracture 3453.00 3453.10 0
2018-01-16 Multi-Stage Fracture 3414.00 3414.10 0
2018-01-16 Multi-Stage Fracture 3375.00 3375.10 0
2018-01-16 Multi-Stage Fracture 3336.00 3336.10 0
2018-01-16 Multi-Stage Fracture 3297.00 3297.10 0
2018-01-16 Multi-Stage Fracture 3258.00 3258.10 0
2018-01-16 Multi-Stage Fracture 3921.00 3921.10 0
2018-01-16 Multi-Stage Fracture 3219.00 3219.10 0
2018-01-16 Multi-Stage Fracture 3180.00 3180.10 0
2018-01-16 Multi-Stage Fracture 3141.00 3141.10 0
2018-01-16 Multi-Stage Fracture 3102.00 3102.10 0
2018-01-16 Multi-Stage Fracture 3063.00 3063.10 0
2018-01-16 Multi-Stage Fracture 3024.00 3024.10 0
2018-01-16 Multi-Stage Fracture 2985.00 2985.10 0
2018-01-16 Multi-Stage Fracture 2946.00 2946.10 0
2018-01-16 Multi-Stage Fracture 2907.00 2907.10 0
2018-01-16 Multi-Stage Fracture 2868.00 2868.10 0
2018-01-16 Multi-Stage Fracture 3882.00 3882.10 0
2018-01-16 Multi-Stage Fracture 2829.00 2829.10 0
2018-01-16 Multi-Stage Fracture 2790.00 2790.10 0
2018-01-16 Multi-Stage Fracture 2751.00 2751.10 0
2018-01-17 Multi-Stage Fracture 2712.00 2712.10 0
2018-01-17 Multi-Stage Fracture 2673.00 2673.10 0
2018-01-17 Multi-Stage Fracture 2634.00 2634.10 0
2018-01-17 Multi-Stage Fracture 2595.00 2595.10 0
2018-01-17 Multi-Stage Fracture 2556.00 2556.10 0
2018-01-17 Multi-Stage Fracture 2517.00 2517.10 0
2018-01-17 Multi-Stage Fracture 2478.00 2478.10 0
2018-01-16 Multi-Stage Fracture 3843.00 3843.10 0
2018-01-16 Multi-Stage Fracture 3804.00 3804.10 0
2018-01-16 Multi-Stage Fracture 3765.00 3765.10 0
2018-01-16 Multi-Stage Fracture 3726.00 3726.10 0
2018-01-16 Multi-Stage Fracture 3687.00 3687.10 0
2018-01-16 Multi-Stage Fracture 3648.00 3648.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-16 2018-01-17 1,951 5,466 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 95.0203 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 3.3171 N/A
40/70 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 1.7074 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0086 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0086 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.0738 N/A
Tergitol 15-S-20 68131-40-8 100 0.0738 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0982 N/A
Methanol 67-56-1 100 0.0982 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0982 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-11 2018-01-16 Surface Water - Runoff 6690

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7810 0.0 0.0 0.0
2019 8749 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-22 No Incident Encountered 0.00 0.00
2018-01-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References