If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485122604000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.168291,"lon":-115.630753,"icon":""}]} |
Location: 00/04-26-048-12W5/0 | |
Location Alias: 00/04-26-48-12 W5M | |
Location Alias 2: 00/04-26-048-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 12 | |
Section: 26 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 4-26-48-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0448429 | |
License Date: 2012-09-13 | |
License Status: Issued | |
Spud Date: 2012-10-19 | |
Final Drill Date: 2012-11-11 | |
Well Total Depth: 3738.00 m | |
Surface Hole Latitude: 53.168291 | |
Surface Hole Longitude: -115.630753 |
Date | Event |
---|---|
2012-09-13 | Obtained License |
2012-10-23 | Surface Casing Operation Performed |
2012-10-24 | Well Log Performed |
2012-10-25 | Direction Drilling Operation Performed - Deviate |
2012-10-31 | Direction Drilling Operation Performed - Horizontal |
2012-11-01 | Well Log Performed |
2012-11-04 | Intermediate Casing Operation Performed |
2012-11-11 | Finished Drilling |
2012-11-11 | Well Log Performed |
2012-11-11 | Well Mode changed to Drilled and Cased |
2012-11-13 | Production Casing Operation Performed |
2012-11-14 | Perforation Treatment Performed - Open-Hole Completion |
2012-11-14 | Rig Released |
2012-11-18 | Well Log Performed |
2012-11-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-03 | Well Began Production |
2012-12-03 | Well Fluid changed to Crude Oil |
2012-12-03 | Well Log Performed |
2012-12-03 | Well Mode changed to Flowing |
2013-01-15 | Well Fluid changed to Crude Oil |
2013-01-15 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-10-19 | Ironhand Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-10-25 | 1583.00 | Deviate (5 - 79 degrees) |
2012-10-31 | 2198.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-11-14 | Open Hole/Barefoot Completion | 3733.00 | 3738.00 | 0 |
2012-11-29 | Multi-Stage Fracture | 3120.10 | 3120.20 | 0 |
2012-11-30 | Multi-Stage Fracture | 3044.60 | 3044.70 | 0 |
2012-11-30 | Multi-Stage Fracture | 2968.70 | 2968.80 | 0 |
2012-11-30 | Multi-Stage Fracture | 2893.40 | 2893.50 | 0 |
2012-11-30 | Multi-Stage Fracture | 2818.00 | 2818.10 | 0 |
2012-11-30 | Multi-Stage Fracture | 2742.50 | 2742.60 | 0 |
2012-11-30 | Multi-Stage Fracture | 2666.80 | 2666.90 | 0 |
2012-11-30 | Multi-Stage Fracture | 2606.20 | 2606.30 | 0 |
2012-11-30 | Multi-Stage Fracture | 2532.40 | 2532.50 | 0 |
2012-11-30 | Multi-Stage Fracture | 2455.70 | 2455.80 | 0 |
2012-11-29 | Multi-Stage Fracture | 3709.40 | 3709.50 | 0 |
2012-11-30 | Multi-Stage Fracture | 2378.60 | 2378.70 | 0 |
2012-11-30 | Multi-Stage Fracture | 2301.30 | 2301.40 | 0 |
2012-11-29 | Multi-Stage Fracture | 3639.80 | 3639.90 | 0 |
2012-11-29 | Multi-Stage Fracture | 3562.40 | 3562.50 | 0 |
2012-11-29 | Multi-Stage Fracture | 3485.40 | 3485.50 | 0 |
2012-11-29 | Multi-Stage Fracture | 3408.90 | 3409.00 | 0 |
2012-11-29 | Multi-Stage Fracture | 3334.40 | 3334.50 | 0 |
2012-11-29 | Multi-Stage Fracture | 3272.50 | 3272.60 | 0 |
2012-11-29 | Multi-Stage Fracture | 3196.10 | 3196.20 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 312 | 0.0 | 0.0 | 0.0 |
2013 | 8294 | 0.0 | 0.0 | 0.0 |
2014 | 8667 | 0.0 | 0.0 | 0.0 |
2015 | 8660 | 0.0 | 0.0 | 0.0 |
2016 | 8763 | 0.0 | 0.0 | 0.0 |
2017 | 8595 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8749 | 0.0 | 0.0 | 0.0 |
2020 | 2179 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-11-14 | No Incident Encountered | 0.00 | 0.00 |
2012-12-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]