X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485111101000

Well Details

Well ID: 0485111101000
Loading map...
Location: 00/01-11-048-11W5/0
Location Alias: 00/01-11-48-11 W5M
Location Alias 2: 00/01-11-048-11 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 11
Section: 11
County/Municipality: Brazeau County
Well Name: DAYLIGHT HZ PEMBINA 1-11-48-11
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0419060
License Date: 2010-03-05
License Status: Issued
Spud Date: 2010-03-17
Final Drill Date: 2010-04-07
Well Total Depth: 2900.00 m
Surface Hole Latitude: 53.122727
Surface Hole Longitude: -115.507161

For data sources see[1][2]

Well History

Date Event
2010-03-05 Obtained License
2010-03-17 Well Log Performed
2010-03-20 Surface Casing Operation Performed
2010-03-22 Direction Drilling Operation Performed - Horizontal
2010-04-02 Intermediate Casing Operation Performed
2010-04-07 Finished Drilling
2010-04-07 Well Mode changed to Drilled and Cased
2010-04-09 Well Log Performed
2010-04-11 Liner Casing Operation Performed
2010-04-12 Rig Released
2010-04-24 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-24 Perforation Treatment Performed - Open-Hole Completion
2010-05-09 Well Began Production
2010-05-09 Well Fluid changed to Crude Oil
2010-05-09 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-22 1596.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-04-24 Open Hole/Barefoot Completion 2896.00 2900.00 0
2010-04-24 Multi-Stage Fracture 2289.40 2289.50 0
2010-04-24 Multi-Stage Fracture 2214.10 2214.20 0
2010-04-24 Multi-Stage Fracture 2138.80 2138.90 0
2010-04-24 Multi-Stage Fracture 2063.60 2063.70 0
2010-04-24 Multi-Stage Fracture 1989.00 1989.10 0
2010-04-24 Multi-Stage Fracture 2875.10 2875.20 0
2010-04-24 Multi-Stage Fracture 2804.70 2804.80 0
2010-04-24 Multi-Stage Fracture 2729.50 2729.60 0
2010-04-24 Multi-Stage Fracture 2654.20 2654.30 0
2010-04-24 Multi-Stage Fracture 2570.50 2570.60 0
2010-04-24 Multi-Stage Fracture 2515.20 2515.30 0
2010-04-24 Multi-Stage Fracture 2428.30 2428.40 0
2010-04-24 Multi-Stage Fracture 2353.00 2353.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5252 0.0 0.0 0.0
2011 7820 0.0 0.0 0.0
2012 8115 0.0 0.0 0.0
2013 7153 0.0 0.0 0.0
2014 8122 0.0 0.0 0.0
2015 8156 0.0 0.0 0.0
2016 8735 0.0 0.0 0.0
2017 4417 0.0 0.0 0.0
2019 540 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-04-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References