If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485081310020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.144975,"lon":-115.037236,"icon":""}]} |
| Location: 02/10-13-048-08W5/0 | |
| Location Alias: 02/10-13-48-08 W5M | |
| Location Alias 2: 02/10-13-048-08 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 08 | |
| Section: 13 | |
| County/Municipality: Brazeau County | |
| Well Name: ARC PEMBINA 10-13-48-8 | |
| Operator Name: ARC Resources Ltd. | |
| License Number: 0040349 | |
| License Date: 1971-06-30 | |
| License Status: RecCertified | |
| Spud Date: 1971-07-20 | |
| Final Drill Date: 1971-07-25 | |
| Well Total Depth: 1522.50 m | |
| Surface Hole Latitude: 53.144975 | |
| Surface Hole Longitude: -115.037236 |
| Date | Event |
|---|---|
| 1971-06-30 | Obtained License |
| 1971-07-25 | Finished Drilling |
| 1971-07-25 | Well Mode changed to Drilled and Cased |
| 1971-07-26 | Production Casing Operation Performed |
| 1971-08-08 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1971-08-08 | Perforation Treatment Performed - Fractured |
| 1971-08-10 | Well Began Production |
| 1971-08-10 | Well Fluid changed to Crude Oil |
| 1971-08-10 | Well Mode changed to Flowing |
| 1972-02-24 | Well Fluid changed to Crude Oil |
| 1972-02-24 | Well Mode changed to Suspended |
| 1972-06-01 | Well Fluid changed to Crude Oil |
| 1972-06-01 | Well Mode changed to Flowing |
| 1975-06-05 | Well Fluid changed to Crude Oil |
| 1975-06-05 | Well Mode changed to Pumping |
| 1981-12-01 | Well Fluid changed to Crude Oil |
| 1981-12-01 | Well Mode changed to Suspended |
| 1998-09-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-09-26 | Plug Back Performed |
| 1998-09-27 | Perforation Treatment Performed - Jet Perforation |
| 1998-09-28 | Perforation Treatment Performed - Remedial Casing |
| 1998-10-02 | Well Abandoned |
| 1998-10-02 | Well Fluid changed to Crude Oil |
| 1998-10-02 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1971-08-08 | Hydra Jet Perforation | 1497.80 | 1497.80 | 0 |
| 1971-08-08 | Fracture | 1497.80 | 1497.80 | 0 |
| 1998-09-26 | Packing Device Capped w/Cement | 1478.00 | 1486.00 | 0 |
| 1998-09-27 | Perforation | 400.30 | 401.30 | 13 |
| 1998-09-28 | Remedial Casing Cementing | 400.30 | 401.30 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1971 | 2142 | 0.0 | 0.0 | 0.0 |
| 1972 | 1728 | 0.0 | 0.0 | 0.0 |
| 1973 | 6593 | 0.0 | 0.0 | 0.0 |
For data sources see[5]