X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485081004000

Well Details

Well ID: 0485081004000
Loading map...
Location: 00/04-10-048-08W5/0
Location Alias: 00/04-10-48-08 W5M
Location Alias 2: 00/04-10-048-08 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 08
Section: 10
County/Municipality: Brazeau County
Well Name: ARC-SEABOARD-PEMBINA 10 4-10-48-8
Operator Name: ARC Resources Ltd.
License Number: 0007769
License Date: 1954-03-03
License Status: Issued
Spud Date: 1954-03-09
Final Drill Date: 1954-03-31
Well Total Depth: 1630.70 m
Surface Hole Latitude: 53.121464
Surface Hole Longitude: -115.095484

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-03-03 Obtained License
1954-03-31 Finished Drilling
1954-03-31 Well Mode changed to Drilled and Cased
1954-04-01 Production Casing Operation Performed
1954-12-14 Perforation Treatment Performed - Jet Perforation
1954-12-17 Perforation Treatment Performed - Acid Wash - No Pressure
1954-12-17 Perforation Treatment Performed - Fractured
1955-01-02 Well Began Production
1955-01-02 Well Fluid changed to Crude Oil
1955-01-02 Well Mode changed to Flowing
1955-02-11 Perforation Treatment Performed - Fractured
1955-02-11 Perforation Treatment Performed - Jet Perforation
1969-12-18 Well Fluid changed to Crude Oil
1969-12-18 Well Mode changed to Pumping
1971-09-02 Perforation Treatment Performed - Fractured
1981-12-18 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-12-14 Perforation 1604.50 1609.00 13
1954-12-17 Acid Wash 1604.50 1609.00 0
1954-12-17 Fracture 1604.50 1609.00 0
1955-02-11 Perforation 1595.90 1599.30 13
1955-02-11 Fracture 1595.90 1599.30 0
1971-09-02 Fracture 1595.90 1609.00 0
1981-12-18 Fracture 1595.90 1609.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2688 0.0 0.0 0.0
1968 5508 0.0 0.0 0.0
1969 5832 0.0 0.0 0.0
1970 6581 0.0 0.0 0.0
1971 8331 0.0 0.0 0.0
1972 8656 0.0 0.0 0.0
1973 8195 0.0 0.0 0.0
1974 8705 0.0 0.0 0.0
1975 8683 0.0 0.0 0.0
1976 8557 0.0 0.0 0.0
1977 8680 0.0 0.0 0.0
1978 8744 0.0 0.0 0.0
1979 8605 0.0 0.0 0.0
1980 8773 0.0 0.0 0.0
1981 8653 0.0 0.0 0.0
1982 8304 0.0 0.0 0.0
1983 8622 0.0 0.0 0.0
1984 8677 0.0 0.0 0.0
1985 8619 0.0 0.0 0.0
1986 8721 0.0 0.0 0.0
1987 8504 0.0 0.0 0.0
1988 8438 0.0 0.0 0.0
1989 7988 0.0 0.0 0.0
1990 8495 0.0 0.0 0.0
1991 8526 0.0 0.0 0.0
1992 8708 0.0 0.0 0.0
1993 8634 0.0 0.0 0.0
1994 8691 0.0 0.0 0.0
1995 8672 0.0 0.0 0.0
1996 8320 0.0 0.0 0.0
1997 6899 0.0 0.0 0.0
1998 8591 0.0 0.0 0.0
1999 8231 0.0 0.0 0.0
2000 8291 0.0 0.0 0.0
2001 8548 0.0 0.0 0.0
2002 8546 0.0 0.0 0.0
2003 8220 0.0 0.0 0.0
2004 7793 0.0 0.0 0.0
2005 8514 0.0 0.0 0.0
2006 8285 0.0 0.0 0.0
2007 8636 0.0 0.0 0.0
2008 7936 0.0 0.0 0.0
2009 8678 0.0 0.0 0.0
2010 5493 0.0 0.0 0.0
2011 7992 0.0 0.0 0.0
2012 7655 0.0 0.0 0.0
2013 8706 0.0 0.0 0.0
2014 8127 0.0 0.0 0.0
2015 8485 0.0 0.0 0.0
2016 8588 0.0 0.0 0.0
2017 8587 0.0 0.0 0.0
2018 8721 0.0 0.0 0.0
2019 8679 0.0 0.0 0.0
2020 2117 0.0 0.0 0.0

For data sources see[5]

References