X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485080902000

Well Details

Well ID: 0485080902000
Loading map...
Location: 00/02-09-048-08W5/0
Location Alias: 00/02-09-48-08 W5M
Location Alias 2: 00/02-09-048-08 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 08
Section: 09
County/Municipality: Brazeau County
Well Name: ARC SEABOARD PEMBINA 9 2-9-48-8
Operator Name: ARC Resources Ltd.
License Number: 0008566
License Date: 1954-10-12
License Status: Issued
Spud Date: 1954-10-19
Final Drill Date: 1954-11-04
Well Total Depth: 1650.80 m
Surface Hole Latitude: 53.121466
Surface Hole Longitude: -115.107814

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-10-12 Obtained License
1954-11-04 Finished Drilling
1954-11-04 Well Mode changed to Drilled and Cased
1954-11-05 Production Casing Operation Performed
1954-12-08 Perforation Treatment Performed - Jet Perforation
1954-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-12-12 Perforation Treatment Performed - Fractured
1954-12-14 Well Began Production
1954-12-14 Well Fluid changed to Crude Oil
1954-12-14 Well Mode changed to Flowing
1956-02-22 Perforation Treatment Performed - Jet Perforation
1958-02-13 Well Fluid changed to Crude Oil
1958-02-13 Well Mode changed to Pumping
1961-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-12-20 Perforation Treatment Performed - Fractured
1961-12-29 Perforation Treatment Performed - Jet Perforation
1972-06-27 Perforation Treatment Performed - Fractured
1972-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-12-08 Perforation 1620.30 1625.20 13
1980-07-02 Acid Treatment 1610.00 1625.20 0
1954-12-12 Acid Treatment 1620.30 1625.20 0
1954-12-12 Fracture 1620.30 1625.20 0
1956-02-22 Perforation 1612.70 1615.40 13
1961-12-20 Acid Treatment 1612.70 1625.20 0
1961-12-20 Fracture 1612.70 1625.20 0
1961-12-29 Perforation 1610.00 1611.80 7
1972-06-27 Fracture 1610.00 1625.20 0
1972-08-08 Acid Treatment 1610.00 1625.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4296 0.0 0.0 0.0
1968 5846 0.0 0.0 0.0
1969 6007 0.0 0.0 0.0
1970 6011 0.0 0.0 0.0
1971 8617 0.0 0.0 0.0
1972 8056 0.0 0.0 0.0
1973 8692 0.0 0.0 0.0
1974 8471 0.0 0.0 0.0
1975 8739 0.0 0.0 0.0
1976 8524 0.0 0.0 0.0
1977 8626 0.0 0.0 0.0
1978 8584 0.0 0.0 0.0
1979 8545 0.0 0.0 0.0
1980 8689 0.0 0.0 0.0
1981 8354 0.0 0.0 0.0
1982 8594 0.0 0.0 0.0
1983 8606 0.0 0.0 0.0
1984 8432 0.0 0.0 0.0
1985 8535 0.0 0.0 0.0
1986 8711 0.0 0.0 0.0
1987 8386 0.0 0.0 0.0
1988 8655 0.0 0.0 0.0
1989 8568 0.0 0.0 0.0
1990 8623 0.0 0.0 0.0
1991 8554 0.0 0.0 0.0
1992 8641 0.0 0.0 0.0
1993 8459 0.0 0.0 0.0
1994 8691 0.0 0.0 0.0
1995 8593 0.0 0.0 0.0
1996 8571 0.0 0.0 0.0
1997 8688 0.0 0.0 0.0
1998 8156 0.0 0.0 0.0
1999 8670 0.0 0.0 0.0
2000 8576 0.0 0.0 0.0
2001 8481 0.0 0.0 0.0
2002 8703 0.0 0.0 0.0
2003 8265 0.0 0.0 0.0
2004 8241 0.0 0.0 0.0
2005 8714 0.0 0.0 0.0
2006 8497 0.0 0.0 0.0
2007 8454 0.0 0.0 0.0
2008 8201 0.0 0.0 0.0
2009 7908 0.0 0.0 0.0
2010 7879 0.0 0.0 0.0
2011 8439 0.0 0.0 0.0
2012 8485 0.0 0.0 0.0
2013 7012 0.0 0.0 0.0
2014 8682 0.0 0.0 0.0
2015 7960 0.0 0.0 0.0
2016 6256 0.0 0.0 0.0
2017 7718 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 6599 0.0 0.0 0.0
2020 908 0.0 0.0 0.0

For data sources see[5]

References