X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485080703042

Well Details

Well ID: 0485080703042
Loading map...
Location: 04/03-07-048-08W5/2
Location Alias: 04/03-07-48-08 W5M
Location Alias 2: 04/03-07-048-08 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 08
Section: 07
County/Municipality: Brazeau County
Well Name: ARC HZ PEMBINA 11-18-48-8
Operator Name: ARC Resources Ltd.
License Number: 0465647
License Date: 2014-03-12
License Status: Suspension
Spud Date: 2014-07-29
Final Drill Date: 2014-08-25
Well Total Depth: 4080.00 m
Surface Hole Latitude: 53.145475
Surface Hole Longitude: -115.168635

For data sources see[1][2]

Well History

Date Event
2014-03-12 Obtained License
2014-07-29 Surface Casing Operation Performed
2014-08-16 Direction Drilling Operation Performed - Horizontal
2014-08-17 Direction Drilling Operation Performed - Deviate
2014-08-18 Well Log Performed
2014-08-19 Direction Drilling Operation Performed - Horizontal
2014-08-19 Intermediate Casing Operation Performed
2014-08-25 Finished Drilling
2014-08-25 Well Mode changed to Drilled and Cased
2014-08-26 Liner Casing Operation Performed
2014-08-26 Perforation Treatment Performed - Open-Hole Completion
2014-08-28 Rig Released
2014-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-20 Well Began Production
2014-11-20 Well Fluid changed to Crude Oil
2014-11-20 Well Mode changed to Pumping
2016-08-01 Well Fluid changed to Crude Oil
2016-08-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-08-16 379.00 Horizontal
2014-08-17 1128.40 Deviate (5 - 79 degrees)
2014-08-19 1847.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-08-26 Open Hole/Barefoot Completion 4065.00 4080.00 0
2014-09-22 Multi-Stage Fracture 3392.90 3393.00 0
2014-09-22 Multi-Stage Fracture 3323.40 3323.50 0
2014-09-22 Multi-Stage Fracture 3254.20 3254.30 0
2014-09-22 Multi-Stage Fracture 3184.70 3184.80 0
2014-09-22 Multi-Stage Fracture 2992.60 2992.70 0
2014-09-22 Multi-Stage Fracture 2924.40 2924.50 0
2014-09-22 Multi-Stage Fracture 2855.00 2855.10 0
2014-09-22 Multi-Stage Fracture 2716.00 2716.10 0
2014-09-22 Multi-Stage Fracture 2646.80 2646.90 0
2014-09-22 Multi-Stage Fracture 2578.30 2578.40 0
2014-09-22 Multi-Stage Fracture 4060.40 4060.50 0
2014-09-22 Multi-Stage Fracture 2510.30 2510.40 0
2014-09-22 Multi-Stage Fracture 2441.90 2442.00 0
2014-09-22 Multi-Stage Fracture 2359.10 2359.20 0
2014-09-22 Multi-Stage Fracture 2180.30 2180.40 0
2014-09-22 Multi-Stage Fracture 2125.70 2125.80 0
2014-09-22 Multi-Stage Fracture 2070.60 2070.70 0
2014-09-22 Multi-Stage Fracture 2014.90 2015.00 0
2014-09-22 Multi-Stage Fracture 1959.20 1959.30 0
2014-09-22 Multi-Stage Fracture 1904.20 1904.30 0
2014-09-22 Multi-Stage Fracture 2785.50 2785.60 0
2014-09-22 Multi-Stage Fracture 4001.80 4001.90 0
2014-09-22 Multi-Stage Fracture 3823.30 3823.40 0
2014-09-22 Multi-Stage Fracture 3740.20 3740.30 0
2014-09-22 Multi-Stage Fracture 3670.70 3670.80 0
2014-09-22 Multi-Stage Fracture 3601.20 3601.30 0
2014-09-22 Multi-Stage Fracture 3531.70 3531.80 0
2014-09-22 Multi-Stage Fracture 3492.00 3492.10 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-09-22 2014-09-22 1,644 3,268 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.9974 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 14.1664 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 3.7296 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7967 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0106 N/A
dibromoacetonitrile 3252-43-5 100 0.0106 N/A
non-hazardous ingredients Not Available 100 0.0106 N/A
polyethylene glycol 25322-68-3 100 0.0106 N/A
sodium bromide 7647-15-6 100 0.0106 N/A
CC-77 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1868 N/A
non-hazardous ingredients Not Available 100 0.1868 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0454 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0454 N/A
non-hazardous ingredients Not Available 100 0.0454 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0701 N/A
isopropanol 67-63-0 100 0.0701 N/A
methanol 67-56-1 100 0.0701 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0701 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0701 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-09-18 2014-09-22 Surface Water - Runoff 3105
2014-09-21 2014-09-21 Surface Water - Runoff 213

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 951 0.0 0.0 0.0
2015 2405 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-08-28 No Incident Encountered 0.00 0.00
2014-09-22 No Incident Encountered 0.00 0.00

For data sources see[9]

References