If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485080609020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.114009,"lon":-115.119876,"icon":""}]} |
Location: 02/09-06-048-08W5/0 | |
Location Alias: 02/09-06-48-08 W5M | |
Location Alias 2: 02/09-06-048-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 08 | |
Section: 06 | |
County/Municipality: Brazeau County | |
Well Name: ARC HZ 102 PEMBINA 9-6-48-8 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0457290 | |
License Date: 2013-06-03 | |
License Status: Amended | |
Spud Date: 2013-07-20 | |
Final Drill Date: 2013-07-28 | |
Well Total Depth: 3652.00 m | |
Surface Hole Latitude: 53.114009 | |
Surface Hole Longitude: -115.119876 |
Date | Event |
---|---|
2013-06-03 | Obtained License |
2013-07-21 | Surface Casing Operation Performed |
2013-07-24 | Intermediate Casing Operation Performed |
2013-07-27 | Well Log Performed |
2013-07-28 | Direction Drilling Operation Performed - Deviate |
2013-07-28 | Direction Drilling Operation Performed - Horizontal |
2013-07-28 | Finished Drilling |
2013-07-28 | Liner Casing Operation Performed |
2013-07-28 | Well Log Performed |
2013-07-28 | Well Mode changed to Drilled and Cased |
2013-07-29 | Perforation Treatment Performed - Open-Hole Completion |
2013-07-29 | Rig Released |
2013-08-03 | Well Log Performed |
2013-08-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-08-25 | Well Began Production |
2013-08-25 | Well Fluid changed to Crude Oil |
2013-08-25 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2013-07-28 | 1326.90 | Deviate (5 - 79 degrees) |
2013-07-28 | 1755.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-07-29 | Open Hole/Barefoot Completion | 3629.00 | 3652.00 | 0 |
2013-08-08 | Multi-Stage Fracture | 2788.50 | 2788.60 | 0 |
2013-08-08 | Multi-Stage Fracture | 2678.90 | 2679.00 | 0 |
2013-08-08 | Multi-Stage Fracture | 2568.90 | 2569.00 | 0 |
2013-08-08 | Multi-Stage Fracture | 2458.90 | 2459.00 | 0 |
2013-08-08 | Multi-Stage Fracture | 2362.70 | 2362.80 | 0 |
2013-08-08 | Multi-Stage Fracture | 2266.40 | 2266.50 | 0 |
2013-08-08 | Multi-Stage Fracture | 2170.10 | 2170.20 | 0 |
2013-08-08 | Multi-Stage Fracture | 2073.50 | 2073.60 | 0 |
2013-08-08 | Multi-Stage Fracture | 1977.60 | 1977.70 | 0 |
2013-08-08 | Multi-Stage Fracture | 1881.10 | 1881.20 | 0 |
2013-08-08 | Multi-Stage Fracture | 3624.40 | 3624.50 | 0 |
2013-08-08 | Multi-Stage Fracture | 3537.50 | 3537.60 | 0 |
2013-08-08 | Multi-Stage Fracture | 3431.00 | 3431.10 | 0 |
2013-08-08 | Multi-Stage Fracture | 3327.60 | 3327.70 | 0 |
2013-08-08 | Multi-Stage Fracture | 3222.60 | 3222.70 | 0 |
2013-08-08 | Multi-Stage Fracture | 3108.40 | 3108.50 | 0 |
2013-08-08 | Multi-Stage Fracture | 3003.70 | 3003.80 | 0 |
2013-08-08 | Multi-Stage Fracture | 2893.80 | 2893.90 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-08-08 | 2013-08-08 | 1,659 | 2,332 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | 7727-37-9 | 100 | 2.9394 | N/A | |||
Water | Not Available | 100 | 84.4261 | N/A | ||||
100 Mesh | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 0.6516 | N/A | ||
20/40 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 1.448 | N/A | ||
30/50 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 6.516 | N/A | ||
40/70 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 3.801 | N/A | ||
B-1008 | Sanjel | Bactericide/Biocide | BNPD | 52-51-7 | 100 | 0.0084 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0084 | N/A | ||||
SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.1688 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1688 | N/A | ||||
FRW-3 | Sanjel | Friction Reducer | Isoparaffinic Solvent | 64742-47-8 | 100 | 0.0403 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0403 | N/A | ||||
Surfactant | 68131-40-8 | 100 | 0.0403 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-08-07 | 2013-08-08 | Surface Water - Runoff | 2754 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 3240 | 0.0 | 0.0 | 0.0 |
2014 | 7690 | 0.0 | 0.0 | 0.0 |
2015 | 8234 | 0.0 | 0.0 | 0.0 |
2016 | 8551 | 0.0 | 0.0 | 0.0 |
2017 | 8517 | 0.0 | 0.0 | 0.0 |
2018 | 8633 | 0.0 | 0.0 | 0.0 |
2019 | 8732 | 0.0 | 0.0 | 0.0 |
2020 | 2179 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-07-29 | No Incident Encountered | 0.00 | 0.00 |
2013-08-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]