If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485080311020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.132319,"lon":-115.089185,"icon":""}]} |
| Location: 02/11-03-048-08W5/0 | |
| Location Alias: 02/11-03-48-08 W5M | |
| Location Alias 2: 02/11-03-048-08 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 08 | |
| Section: 03 | |
| County/Municipality: Brazeau County | |
| Well Name: ARC HZ 102 PEMBINA 11-3-48-8 | |
| Operator Name: ARC Resources Ltd. | |
| License Number: 0461766 | |
| License Date: 2013-12-03 | |
| License Status: Issued | |
| Spud Date: 2014-07-28 | |
| Final Drill Date: 2014-08-07 | |
| Well Total Depth: 3405.00 m | |
| Surface Hole Latitude: 53.132319 | |
| Surface Hole Longitude: -115.089185 |
| Date | Event |
|---|---|
| 2013-12-03 | Obtained License |
| 2014-07-29 | Surface Casing Operation Performed |
| 2014-07-31 | Direction Drilling Operation Performed - Deviate |
| 2014-08-01 | Direction Drilling Operation Performed - Horizontal |
| 2014-08-02 | Intermediate Casing Operation Performed |
| 2014-08-07 | Finished Drilling |
| 2014-08-07 | Well Log Performed |
| 2014-08-07 | Well Mode changed to Drilled and Cased |
| 2014-08-08 | Liner Casing Operation Performed |
| 2014-08-08 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-08-08 | Rig Released |
| 2014-09-04 | Well Log Performed |
| 2014-09-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-10-10 | Well Began Production |
| 2014-10-10 | Well Fluid changed to Crude Oil |
| 2014-10-10 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-07-28 | Excalibur Drilling Ltd. | 8 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-07-31 | 1192.10 | Deviate (5 - 79 degrees) |
| 2014-08-01 | 1713.40 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-08-08 | Open Hole/Barefoot Completion | 3397.00 | 3405.00 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 2731.80 | 2731.90 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 2640.70 | 2640.80 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 2566.10 | 2566.20 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 2488.60 | 2488.70 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 2412.00 | 2412.10 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 2330.00 | 2330.10 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 2249.50 | 2249.60 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 2092.90 | 2093.00 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 2024.40 | 2024.50 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 1956.30 | 1956.40 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 3392.00 | 3392.10 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 1888.20 | 1888.30 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 1834.40 | 1834.50 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 1781.50 | 1781.60 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 3344.60 | 3344.70 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 3265.00 | 3265.10 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 3198.40 | 3198.50 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 3129.70 | 3129.80 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 3048.90 | 3049.00 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 2890.30 | 2890.40 | 0 |
| 2014-09-18 | Multi-Stage Fracture | 2809.20 | 2809.30 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-09-18 | 2014-09-18 | 1,600 | 2,666 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 86.0195 | N/A | |||
| Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 13.7554 | N/A | ||
| Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 5.2755 | N/A | ||
| Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 0.5535 | N/A | ||
| Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0107 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0107 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0107 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.0107 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0107 | N/A | ||||
| CC-77 | Trican | Clay Control | 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide | 7744 | 100 | 0.189 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.189 | N/A | ||||
| FR-8 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.046 | N/A | |
| distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.046 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.046 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-09-04 | 2014-09-06 | Surface Water - Runoff | 2499 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 1704 | 0.0 | 0.0 | 0.0 |
| 2015 | 7898 | 0.0 | 0.0 | 0.0 |
| 2016 | 7299 | 0.0 | 0.0 | 0.0 |
| 2017 | 8253 | 0.0 | 0.0 | 0.0 |
| 2018 | 8654 | 0.0 | 0.0 | 0.0 |
| 2019 | 8631 | 0.0 | 0.0 | 0.0 |
| 2020 | 2111 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-08-08 | No Incident Encountered | 0.00 | 0.00 |
| 2014-09-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]