If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485080308030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.107257,"lon":-115.111774,"icon":""}]} |
Location: 03/08-03-048-08W5/0 | |
Location Alias: 03/08-03-48-08 W5M | |
Location Alias 2: 03/08-03-048-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 08 | |
Section: 03 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA 103 HZ PEMBINA 8-3-48-8 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0479561 | |
License Date: 2016-05-31 | |
License Status: Issued | |
Spud Date: 2016-06-30 | |
Final Drill Date: 2016-07-07 | |
Well Total Depth: 4123.00 m | |
Surface Hole Latitude: 53.107257 | |
Surface Hole Longitude: -115.111774 |
Date | Event |
---|---|
2016-05-31 | Obtained License |
2016-07-01 | Surface Casing Operation Performed |
2016-07-02 | Direction Drilling Operation Performed - Deviate |
2016-07-03 | Direction Drilling Operation Performed - Horizontal |
2016-07-07 | Finished Drilling |
2016-07-07 | Well Mode changed to Drilled and Cased |
2016-07-08 | Well Log Performed |
2016-07-09 | Production Casing Operation Performed |
2016-07-10 | Rig Released |
2016-07-12 | Well Log Performed |
2016-07-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-07-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-07-29 | Well Began Production |
2016-07-29 | Well Fluid changed to Crude Oil |
2016-07-29 | Well Mode changed to Pumping |
2017-07-08 | Well Log Performed |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-06-30 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-07-02 | 652.00 | Deviate (5 - 79 degrees) |
2016-07-03 | 1801.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-07-18 | Multi-Stage Fracture | 4069.80 | 4071.70 | 0 |
2016-07-18 | Multi-Stage Fracture | 3586.20 | 3588.10 | 0 |
2016-07-18 | Multi-Stage Fracture | 3532.50 | 3534.40 | 0 |
2016-07-18 | Multi-Stage Fracture | 3479.10 | 3481.00 | 0 |
2016-07-18 | Multi-Stage Fracture | 3424.80 | 3426.70 | 0 |
2016-07-18 | Multi-Stage Fracture | 3370.90 | 3372.80 | 0 |
2016-07-18 | Multi-Stage Fracture | 3316.50 | 3318.30 | 0 |
2016-07-18 | Multi-Stage Fracture | 3262.60 | 3264.50 | 0 |
2016-07-18 | Multi-Stage Fracture | 3209.00 | 3210.80 | 0 |
2016-07-18 | Multi-Stage Fracture | 3154.50 | 3156.40 | 0 |
2016-07-18 | Multi-Stage Fracture | 3100.20 | 3102.10 | 0 |
2016-07-18 | Multi-Stage Fracture | 4015.20 | 4017.10 | 0 |
2016-07-18 | Multi-Stage Fracture | 3045.80 | 3047.70 | 0 |
2016-07-18 | Multi-Stage Fracture | 2991.60 | 2993.40 | 0 |
2016-07-18 | Multi-Stage Fracture | 2937.80 | 2939.70 | 0 |
2016-07-18 | Multi-Stage Fracture | 2883.90 | 2885.80 | 0 |
2016-07-18 | Multi-Stage Fracture | 2830.30 | 2832.20 | 0 |
2016-07-18 | Multi-Stage Fracture | 2777.00 | 2778.90 | 0 |
2016-07-18 | Multi-Stage Fracture | 2723.50 | 2725.40 | 0 |
2016-07-18 | Multi-Stage Fracture | 2669.80 | 2671.70 | 0 |
2016-07-19 | Multi-Stage Fracture | 2616.60 | 2618.40 | 0 |
2016-07-19 | Multi-Stage Fracture | 2562.70 | 2564.60 | 0 |
2016-07-18 | Multi-Stage Fracture | 3961.40 | 3963.30 | 0 |
2016-07-19 | Multi-Stage Fracture | 2509.00 | 2510.90 | 0 |
2016-07-19 | Multi-Stage Fracture | 2454.50 | 2456.40 | 0 |
2016-07-19 | Multi-Stage Fracture | 2400.90 | 2402.80 | 0 |
2016-07-19 | Multi-Stage Fracture | 2347.30 | 2349.10 | 0 |
2016-07-19 | Multi-Stage Fracture | 2293.10 | 2295.00 | 0 |
2016-07-19 | Multi-Stage Fracture | 2239.20 | 2241.10 | 0 |
2016-07-19 | Multi-Stage Fracture | 2185.50 | 2187.40 | 0 |
2016-07-19 | Multi-Stage Fracture | 2131.40 | 2133.30 | 0 |
2016-07-19 | Multi-Stage Fracture | 2077.70 | 2079.50 | 0 |
2016-07-19 | Multi-Stage Fracture | 2024.20 | 2026.10 | 0 |
2016-07-18 | Multi-Stage Fracture | 3908.10 | 3910.00 | 0 |
2016-07-19 | Multi-Stage Fracture | 1970.50 | 1972.40 | 0 |
2016-07-19 | Multi-Stage Fracture | 1917.20 | 1919.10 | 0 |
2016-07-19 | Multi-Stage Fracture | 1863.30 | 1865.20 | 0 |
2016-07-18 | Multi-Stage Fracture | 3854.30 | 3856.20 | 0 |
2016-07-18 | Multi-Stage Fracture | 3800.30 | 3802.20 | 0 |
2016-07-18 | Multi-Stage Fracture | 3747.00 | 3748.90 | 0 |
2016-07-18 | Multi-Stage Fracture | 3693.20 | 3695.10 | 0 |
2016-07-18 | Multi-Stage Fracture | 3639.70 | 3641.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-07-18 | 2016-07-19 | 1,621 | 3,869 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 84.6352 | N/A | |||
Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 6.2675 | N/A | ||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 8.7869 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0109 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0109 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0109 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0109 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0109 | N/A | ||||
CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1687 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1687 | N/A | ||||
FR-18 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0893 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0893 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0893 | N/A | ||||
S-17W | Trican | Surfactant | ethylene/propylene oxide polymer | Not Available | 100 | 0.0412 | N/A | |
methanol | 67-56-1 | 100 | 0.0412 | N/A | ||||
water | Not Available | 100 | 0.0412 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-07-17 | 2016-07-19 | Surface Water - Runoff | 3984 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 3544 | 0.0 | 0.0 | 0.0 |
2017 | 8476 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8565 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-07-10 | No Incident Encountered | 0.00 | 0.00 |
2016-07-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]