X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485080211000

Well Details

Well ID: 0485080211000
Loading map...
Location: 00/11-02-048-08W5/0
Location Alias: 00/11-02-48-08 W5M
Location Alias 2: 00/11-02-048-08 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 08
Section: 02
County/Municipality: Brazeau County
Well Name: BONTERRA HZ PEMBINA 11-2-48-8
Operator Name: Bonterra Energy Corp.
License Number: 0479720
License Date: 2016-06-22
License Status: Issued
Spud Date: 2016-07-11
Final Drill Date: 2016-07-17
Well Total Depth: 3303.00 m
Surface Hole Latitude: 53.129667
Surface Hole Longitude: -115.071571

For data sources see[1][2]

Well History

Date Event
2016-06-22 Obtained License
2016-07-12 Surface Casing Operation Performed
2016-07-13 Direction Drilling Operation Performed - Deviate
2016-07-14 Direction Drilling Operation Performed - Horizontal
2016-07-17 Finished Drilling
2016-07-17 Well Log Performed
2016-07-17 Well Mode changed to Drilled and Cased
2016-07-18 Production Casing Operation Performed
2016-07-18 Rig Released
2016-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-03 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-08 Well Began Production
2016-08-08 Well Fluid changed to Crude Oil
2016-08-08 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-07-11 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-07-13 1217.70 Deviate (5 - 79 degrees)
2016-07-14 1763.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-08-02 Multi-Stage Fracture 3249.40 3251.30 0
2016-08-02 Multi-Stage Fracture 2766.90 2768.80 0
2016-08-02 Multi-Stage Fracture 2713.40 2715.30 0
2016-08-02 Multi-Stage Fracture 2660.30 2662.20 0
2016-08-02 Multi-Stage Fracture 2606.50 2608.40 0
2016-08-02 Multi-Stage Fracture 2552.60 2554.50 0
2016-08-02 Multi-Stage Fracture 2498.90 2500.80 0
2016-08-02 Multi-Stage Fracture 2444.60 2446.50 0
2016-08-02 Multi-Stage Fracture 2390.50 2392.40 0
2016-08-02 Multi-Stage Fracture 2336.90 2338.80 0
2016-08-02 Multi-Stage Fracture 2283.20 2285.10 0
2016-08-02 Multi-Stage Fracture 3195.60 3197.50 0
2016-08-02 Multi-Stage Fracture 2229.90 2231.80 0
2016-08-03 Multi-Stage Fracture 2176.40 2178.30 0
2016-08-03 Multi-Stage Fracture 2123.00 2124.90 0
2016-08-03 Multi-Stage Fracture 2069.50 2071.40 0
2016-08-03 Multi-Stage Fracture 2015.20 2017.10 0
2016-08-03 Multi-Stage Fracture 1960.80 1962.70 0
2016-08-03 Multi-Stage Fracture 1907.10 1909.00 0
2016-08-03 Multi-Stage Fracture 1853.10 1855.00 0
2016-08-03 Multi-Stage Fracture 1799.80 1801.70 0
2016-08-02 Multi-Stage Fracture 3141.80 3143.70 0
2016-08-02 Multi-Stage Fracture 3088.30 3090.20 0
2016-08-02 Multi-Stage Fracture 3034.80 3036.70 0
2016-08-02 Multi-Stage Fracture 2981.00 2982.90 0
2016-08-02 Multi-Stage Fracture 2927.80 2929.70 0
2016-08-02 Multi-Stage Fracture 2874.90 2876.80 0
2016-08-02 Multi-Stage Fracture 2820.80 2822.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-08-02 2016-08-03 1,589 2,400 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.6394 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 5.2058 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 9.8527 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0131 N/A
2-mercaptoethanol 60-24-2 100 0.0131 N/A
dibromoacetonitrile 3252-43-5 100 0.0132 N/A
non-hazardous ingredients Not Available 100 0.0131 N/A
sodium bromide 7647-15-6 100 0.0131 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1606 N/A
non-hazardous ingredients Not Available 100 0.1606 N/A
FR-18 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0859 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0859 N/A
non-hazardous ingredients Not Available 100 0.0859 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0422 N/A
methanol 67-56-1 100 0.0422 N/A
water Not Available 100 0.0422 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-07-31 2016-08-02 Surface Water - Lake 2545

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 3374 0.0 0.0 0.0
2017 8410 0.0 0.0 0.0
2018 8557 0.0 0.0 0.0
2019 8163 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-18 No Incident Encountered 0.00 0.00
2016-08-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References