X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485080210040

Well Details

Well ID: 0485080210040
Loading map...
Location: 04/10-02-048-08W5/0
Location Alias: 04/10-02-48-08 W5M
Location Alias 2: 04/10-02-048-08 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 08
Section: 02
County/Municipality: Brazeau County
Well Name: ARC HZ 104 PEMBINA 10-2-48-8
Operator Name: ARC Resources Ltd.
License Number: 0457808
License Date: 2013-07-02
License Status: Amended
Spud Date: 2013-07-30
Final Drill Date: 2013-08-14
Well Total Depth: 4510.00 m
Surface Hole Latitude: 53.143342
Surface Hole Longitude: -115.059216

For data sources see[1][2]

Well History

Date Event
2013-07-02 Obtained License
2013-07-31 Surface Casing Operation Performed
2013-08-01 Direction Drilling Operation Performed - Deviate
2013-08-01 Direction Drilling Operation Performed - Horizontal
2013-08-04 Intermediate Casing Operation Performed
2013-08-14 Finished Drilling
2013-08-14 Well Log Performed
2013-08-14 Well Mode changed to Drilled and Cased
2013-08-16 Liner Casing Operation Performed
2013-08-17 Perforation Treatment Performed - Open-Hole Completion
2013-08-17 Rig Released
2013-08-21 Well Log Performed
2013-08-24 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-25 Well Began Production
2013-08-25 Well Fluid changed to Crude Oil
2013-08-25 Well Mode changed to Flowing
2013-09-06 Well Fluid changed to Crude Oil
2013-09-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-07-30 Excalibur Drilling Ltd. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-08-01 1221.00 Deviate (5 - 79 degrees)
2013-08-01 1665.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-08-17 Open Hole/Barefoot Completion 4487.00 4510.00 0
2013-08-24 Multi-Stage Fracture 3565.80 3565.90 0
2013-08-24 Multi-Stage Fracture 3442.80 3442.90 0
2013-08-24 Multi-Stage Fracture 3324.20 3324.30 0
2013-08-24 Multi-Stage Fracture 3203.00 3203.10 0
2013-08-24 Multi-Stage Fracture 3076.50 3076.60 0
2013-08-24 Multi-Stage Fracture 2954.10 2954.20 0
2013-08-24 Multi-Stage Fracture 2839.50 2839.60 0
2013-08-24 Multi-Stage Fracture 2724.50 2724.60 0
2013-08-24 Multi-Stage Fracture 2607.70 2607.80 0
2013-08-24 Multi-Stage Fracture 2496.10 2496.20 0
2013-08-24 Multi-Stage Fracture 4482.40 4482.50 0
2013-08-24 Multi-Stage Fracture 2373.20 2373.30 0
2013-08-24 Multi-Stage Fracture 2251.90 2252.00 0
2013-08-24 Multi-Stage Fracture 2129.80 2129.90 0
2013-08-24 Multi-Stage Fracture 2006.70 2006.80 0
2013-08-24 Multi-Stage Fracture 1829.80 1829.90 0
2013-08-24 Multi-Stage Fracture 4397.50 4397.60 0
2013-08-24 Multi-Stage Fracture 4280.90 4281.00 0
2013-08-24 Multi-Stage Fracture 4159.30 4159.40 0
2013-08-24 Multi-Stage Fracture 4041.40 4041.50 0
2013-08-24 Multi-Stage Fracture 3925.60 3925.70 0
2013-08-24 Multi-Stage Fracture 3802.20 3802.30 0
2013-08-24 Multi-Stage Fracture 3679.20 3679.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-24 2013-08-24 1,562 2,387 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen 7727-37-9 100 2.6112 N/A
Water Not Available 100 84.761 N/A
20/40 Sanjel Crystalline Silica 14808-60-7 100 6.1817 N/A
30/50 Sanjel Crystalline Silica 14808-60-7 100 4.9738 N/A
40/70 Sanjel Crystalline Silica 14808-60-7 100 0.5329 N/A
50/140 Sanjel Crystalline Silica 14808-60-7 100 0.7105 N/A
B-1008 Sanjel Bactericide/Biocide BNPD 52-51-7 100 0.0086 N/A
Methyl Alcohol 67-56-1 100 0.0086 N/A
SCC-6L Sanjel Clay Control 1.6-Hexanediamine dihydrochloride 6055-52-3 100 0.1769 N/A
Non-Hazardous Ingredients Not Available 100 0.1769 N/A
FRW-3 Sanjel Friction Reducer Isoparaffinic Solvent 64742-47-8 100 0.0431 N/A
Non-Hazardous Ingredients Not Available 100 0.0431 N/A
Surfactant 68131-40-8 100 0.0431 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-08-21 2013-08-24 Surface Water - Runoff 2328

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 2424 0.0 0.0 0.0
2014 7386 0.0 0.0 0.0
2015 8592 0.0 0.0 0.0
2016 7721 0.0 0.0 0.0
2017 3454 0.0 0.0 0.0
2018 8553 0.0 0.0 0.0
2019 7657 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-17 No Incident Encountered 0.00 0.00
2013-09-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References