X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485073416000

Well Details

Well ID: 0485073416000
Loading map...
Location: 00/16-34-048-07W5/0
Location Alias: 00/16-34-48-07 W5M
Location Alias 2: 00/16-34-048-07 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 07
Section: 34
County/Municipality: Brazeau County
Well Name: WHITEHALL PEMBINA IN 16-34-48-7
Operator Name: ExxonMobil Canada Energy
License Number: 0011883
License Date: 1956-07-19
License Status: RecCertified
Spud Date: 1956-08-24
Final Drill Date: 1956-09-08
Well Total Depth: 1365.50 m
Surface Hole Latitude: 53.190500
Surface Hole Longitude: -114.932920

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-07-19 Obtained License
1956-08-24 Direction Drilling Operation Performed - 98
1956-09-08 Finished Drilling
1956-09-08 Production Casing Operation Performed
1956-09-08 Well Mode changed to Drilled and Cased
1956-09-12 Perforation Treatment Performed - Fractured
1956-09-12 Perforation Treatment Performed - Jet Perforation
1956-09-17 Well Began Production
1956-09-17 Well Fluid changed to Crude Oil
1956-09-17 Well Mode changed to Flowing
1959-07-18 Well Fluid changed to Crude Oil
1959-07-18 Well Mode changed to Pumping
1959-12-22 Well Began Injection
1959-12-22 Well Fluid changed to Water
1959-12-22 Well Type changed to Injection
1963-03-12 Perforation Treatment Performed - Cement Squeeze
1963-03-26 Perforation Treatment Performed - Fractured
1963-03-26 Perforation Treatment Performed - Jet Perforation
1966-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-05-12 Well Abandoned
1966-05-12 Well Fluid changed to Water
1966-05-12 Well Mode changed to Abandoned
1966-05-12 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1956-08-24 1035.40 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-09-12 Perforation 1336.20 1344.20 13
1956-09-12 Fracture 1336.20 1344.20 0
1963-03-12 Cement Squeeze 1336.20 1344.20 0
1963-03-26 Perforation 1338.10 1344.20 13
1963-03-26 Fracture 1338.10 1344.20 0
1966-05-12 Packing Device Capped w/Cement 1328.30 1328.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0

For data sources see[6]

References